There will be a growth program. It's implementing in phases. Obviously, to reach an initial operating capability, not everything will be operable immediately. We will still be operating the CF-18s, as we draw them down, at the same time that we build up the F-35 capability, until 2032. We will absolutely ensure that we have the ability to operate from our forward operating locations.
