With regard to the National Shipbuilding Strategy (NSS): (a) what is the full budget for the Canadian Surface Combatants (CSC), including (i) design, (ii) construction, (iii) licences, including intellectual property (IP) licences, (iv) spares, (v) taxes, (vi) contingencies, (vii) any specific infrastructure required for building the CSC in Halifax and all associated costs and considerations; (b) what is the total expected cost or value of the Industrial and Technological Benefits (ITB) Policies on each vessel built under the NSS, including an explanation of how these costs are calculated and how the ITB costs are validated; (c) what is the list of estimated costs that the ITB policies is adding to each vessel under the NSS, and the summary of any discussion had at the NSS Secretariat, Privy Council Office or at the deputy minister level regarding costs of the ITB policies as it relates to NSS; (d) what is the summary of any analysis conducted on the ITB policies, and a comparison in relation to any similar policy existing in the United Kingdom or in the United States frigate programs; and (e) what is the full costing of the first Arctic and offshore patrol ship, including the cost of (i) design, (ii) IP licences; (iii) construction, (iv) commissioning, (v) taxes, (vi) profit, (vii) contingencies?
In the House of Commons on May 5th, 2021. See this statement in context.