Right, and I congratulate you on that approach, too, because there are a lot of assumptions that we make in these costing premises.
I want to go through some of these cost savings that have been identified throughout our study and by other stakeholders that I think you did not include as savings measures in your report. One of them I think you've already identified. Am I correct in assuming that potential savings from a streamlined administration system are possible but were not costed in your report? Is that correct?