Okay. It's unlikely 25%, but we're not sure.
You talked about the funding that was promised and left unspent and the procurement workload. At the same time, the NSPS came out with a whole lot of requirements.
I believe you said in your report that part of the problem was that there was no prioritization. Had there been prioritization, those things could perhaps have gone through more quickly instead of having everything plugging up the system at once.
Has that been solved, or is that still the case?