Generally speaking, there are major players in the waste business. Ontario Power Generation—and I don't want to speak for Glenn—has a large portion of the low- and intermediate-level waste, as well as the used fuel. They are also, like AECL, a large component of the discussion. Hydro-Québec and New Brunswick also have a share, a smaller share, based on the size of their generating footprint. OPG owns all the waste from Bruce Power as well as from their own operations
AECL and OPG are the two large arms, and Nuclear Waste Management Organization's role is to accept the used fuel, which will come predominantly from OPG, then through New Brunswick Power, Hydro-Québec, and a very small portion of AECL's material.