Building Canada Strong Act

An Act respecting certain measures to strengthen the economy

Sponsor

Steven MacKinnon  Liberal

Status

In committee (House), as of Oct. 8, 2026

Subscribe to a feed (what's a feed?) of speeches and votes in the House related to Bill C-39.

Summary

This is from the published bill. The Library of Parliament has also written a full legislative summary of the bill.

Part 1 implements certain measures in relation to project evaluations.
Division 1 of Part 1 amends the Impact Assessment Act to, among other things,
(a) provide that the Canadian Nuclear Safety Commission is to conduct the impact assessment of a designated project that includes activities that are regulated under the Nuclear Safety and Control Act ;
(b) authorize the Minister of the Environment to grant certain federal authorizations that are required in respect of a designated project at the same time that the Minister issues a decision statement in respect of the project;
(c) ensure that a decision statement in respect of a designated project for which the Impact Assessment Agency of Canada conducts the impact assessment is issued within one year after the proponent provides the required information or studies;
(d) provide for the coordination of the impact assessment of designated projects and the review processes for certain federal authorizations that are required in respect of those projects; and
(e) provide for the coordination of consultations with Indigenous groups.
Division 2 of Part 1 amends the Building Canada Act to, among other things,
(a) establish, for certain types of projects located within a region of national interest, a similar framework to the one applicable to national interest projects;
(b) allow the minister designated under that Act to add, remove or amend any condition in respect of an authorization that was granted for a national interest project before the name of that project was added to Schedule 1 to that Act;
(c) ensure that obligations to make information public associated with decisions made under that Act are administratively feasible; and
(d) authorize the Governor in Council to add the name of a region to a new schedule to that Act if the Governor in Council is of the opinion, having regard to certain factors, that the designation of that region is in the national interest.
Division 3 of Part 1 amends the Canadian Energy Regulator Act to, among other things,
(a) ensure decisions in respect of pipelines, designated power lines and offshore renewable energy projects are issued within one year of receiving the required information and studies;
(b) provide for the coordination of consultations with Indigenous peoples of Canada in respect of pipelines, designated power lines and offshore renewable energy projects;
(c) provide for the coordination of federal authorizations in respect of pipelines, designated power lines and offshore renewable energy projects with federal authorities;
(d) provide that the Commission is the sole assessor of applications in respect of pipelines, designated power lines and offshore renewable energy projects;
(e) provide authority for the Commission to
(i) make decisions in respect of applications relating to pipelines, designated power lines and offshore renewable energy projects, unless otherwise specified in the Act,
(ii) exempt certain pipelines or branches of or extensions to pipelines from the application of certain provisions, and
(iii) integrate a detailed route hearing into an ongoing hearing; and
(f) provide that the Governor in Council is to determine whether certain pipelines and designated power lines are in the public interest.
It also makes consequential amendments to the Federal Courts Act and the Northern Pipeline Act .
Division 4 of Part 1 amends the Canadian Navigable Waters Act to require the Minister of Transport to, among other things, take into account the feasibility of the terms and conditions in respect of an approval relating to certain works. It also transfers to that Minister the power to exempt bodies of water from the application of certain provisions of the Act if that Minister is satisfied that it would be in the public interest. Finally, it allows the Governor in Council to make regulations to exclude structures, devices or other things from the definition “work” to avoid duplication with other Acts and regulations.
Division 5 of Part 1 amends the Canadian Environmental Protection Act, 1999 to, among other things,
(a) ensure that environmental protection compliance orders may be issued with respect to any thing to which that Act applies and to non-continuing offences, including with respect to contravening imports;
(b) broaden the scope of such orders by permitting an enforcement officer to direct a person to take additional measures, such as managing contravening imports in the manner specified in the order, returning them to their place of origin or removing them from Canada; and
(c) provide that certain permits issued under that Act may, in certain circumstances, be valid for more than one year.
Division 6 of Part 1 amends the Species at Risk Act to, among other things, require the competent minister to take into account the feasibility of the terms and conditions in respect of certain agreements and permits.
Division 7 of Part 1 amends the Fisheries Act to, among other things,
(a) modify the fish habitat bank regime to allow for the use of habitat credits by third parties;
(b) authorize the making of regulations respecting the circumstances in which a person who is authorized to carry on a work, undertaking or activity may pay a fee to offset adverse effects on fish and fish habitat and provide for these fees to be credited to the Environmental Damages Fund; and
(c) transfer certain regulation-making powers from the Governor in Council to the Minister of Fisheries and Oceans.
Part 2 implements certain measures in relation to supply chains.
Division 1 of Part 2 amends the Department of Transport Act to provide the Minister of Transport with the power to establish a transportation project office that coordinates review processes for federal authorizations and consultations with respect to transportation projects.
Division 2 of Part 2 amends the Canada Transportation Act to, among other things,
(a) provide that the Minister of Transport may designate geographic areas as trade corridors and establish the National Trade Corridors Council, whose mandate is to monitor the movement of goods in trade corridors, analyze disruptions that may affect trade corridors and make recommendations and provide advice to that Minister;
(b) provide that Minister with the authority to make regulations to give effect to international standards or ensure compliance with Canada’s international obligations;
(c) expand the purposes for which that Minister may request that federal departments and agencies provide information that has already been provided by regulated entities to those federal departments and agencies;
(d) clarify the application of the requirement to notify that Minister of proposed transactions involving transportation undertakings;
(e) reduce the threshold for the requirement to notify that Minister and the Commissioner of Competition of proposed transactions involving transportation undertakings situated in a “port”, as defined in section 5 of the Canada Marine Act ;
(f) provide that that Minister may, for any purpose related to transportation security or safety, to the integrity of the national transportation system or to public safety or for any purpose specified by order, grant, suspend or cancel security clearances;
(g) authorize, for the purposes of administering and enforcing the security clearances regime, certain individuals or entities to collect information from and disclose information to each other;
(h) authorize the Governor in Council to make regulations respecting security clearances;
(i) expand the exceptions to the requirement to obtain the Canadian Transportation Agency’s approval for the construction of railway lines; and
(j) establish, for a period of four years, a zone in Manitoba, Saskatchewan and Alberta in which any interswitching that occurs is subject to the rate determined by the Canadian Transportation Agency.
Division 3 of Part 2 amends the Canada Marine Act to, among other things,
(a) authorize the Governor in Council to allow a port authority to enter into joint-liability arrangements and to create entities other than wholly-owned subsidiaries to undertake activities within or outside the limits of the port;
(b) authorize the Minister of Transport to appoint certain directors of a port authority;
(c) add principles that a port authority must observe when fixing port fees and expand the grounds on which a fee-related complaint may be filed with the Canadian Transportation Agency;
(d) authorize the Governor in Council to appoint, in certain circumstances, an administrator for a not-for-profit corporation that has entered into an agreement in respect of the St. Lawrence Seaway;
(e) authorize that Minister to terminate such an agreement or any part of one and provide for a dispute resolution process to deal with any disputes arising from the termination; and
(f) authorize that Minister to require that any of the following persons take measures to prevent or mitigate certain threats or stop any activity that would contribute to such threats:
(i) a port authority,
(ii) a person in charge of a port facility,
(iii) a person responsible for the management and operation of all or part of the St. Lawrence Seaway or for any works, undertakings or property used in the operation of the Seaway,
(iv) an occupier or person in charge of any federal real property, or any federal immovable, that is subject to being administered under Part 3 of that Act.
It also makes consequential amendments to the Port Authorities Operations Regulations .
Division 4 of Part 2 amends the Marine Liability Act to, among other things,
(a) modify the definition “receiver” to refer to the person who physically receives bulk hazardous and noxious substances carried by sea as cargo and discharged at a port or terminal in Canada; and
(b) harmonize the inspection and enforcement provisions relating to that person.
It also makes related amendments to the Safeguarding Canada’s Seas and Skies Act .
Division 5 of Part 2 amends the Coasting Trade Act to allow foreign ships or non-duty paid ships to engage, without a licence, in activities in response to a declared emergency.
Division 6 of Part 2 repeals the Shipping Conferences Exemption Act, 1987 and makes a consequential amendment to the Access to Information Act .
Division 7 of Part 2 amends the International Bridges and Tunnels Act to allow the Minister of Transport to make certain decisions that were previously made exclusively by the Governor in Council.
Division 8 of Part 2 enacts the Enabling Digital Trade Act which, among other things,
(a) sets out the rules for the use of electronic trade documents as the functional equivalents to paper trade documents that are related to trade in goods;
(b) eliminates the requirement to provide information to the Government of Canada in physical form in relation to the importation or exportation of goods; and
(c) permits a federal minister, or an officer or employee of a department or agency of the Government of Canada, to disclose information that is related to the importation or exportation of goods if the receiving minister, department or agency of the government is permitted by law to collect that information.
Part 3 implements certain measures related to the work force.
Division 1 of Part 3 amends the Canada Labour Code to, among other things,
(a) establish new requirements and timelines related to collective bargaining;
(b) provide for the transfer of certain rights in the context of certain contractors being replaced by new contractors;
(c) establish new requirements and authorities in relation to entering into first collective agreements;
(d) provide that the Canada Industrial Relations Board may certify a trade union as the bargaining agent for existing bargaining units in certain industries in certain geographic areas on application of two or more employers, on referral of the Minister of Labour or on that Board’s initiative;
(e) confer on the Minister of Labour the power to appoint a special mediator to assist parties in settling a dispute that arises in connection with the entering into, renewal or revision of a collective agreement; and
(f) establish new requirements for that Minister to direct the Canada Industrial Relations Board to take measures under section 107 of that Act.
It also makes consequential amendments to certain regulations.
Division 2 of Part 3 amends the Canada Labour Code to, among other things,
(a) authorize the Head of Compliance and Enforcement to issue a settlement enforcement order requiring an employer or director of a corporation to pay any outstanding amounts that are to be paid under a settlement with an employee; and
(b) permit an order to debtor to be issued, in certain circumstances, before a settlement enforcement order or payment order has been issued.
Division 3 of Part 3 provides that Division XIII of Part III of the Canada Labour Code does not apply to an employer and employees who are parties to a collective agreement that confers rights and benefits at least as favourable as those conferred by that Division XIII with respect to medical leave of absence with pay.
Division 4 of Part 3 amends the Wage Earner Protection Program Act to, among other things, define the term “former employer” for the purposes of that Act and to specify that the Minister may confirm, vary or rescind a determination of eligibility even without a request for review.

Elsewhere

All sorts of information on this bill is available at LEGISinfo, an excellent resource from Parliament. You can also read the full text of the bill.

Bill numbers are reused for different bills each new session. Perhaps you were looking for one of these other C-39s:

C-39 (2023) Law An Act to amend An Act to amend the Criminal Code (medical assistance in dying)
C-39 (2017) An Act to amend the Criminal Code (unconstitutional provisions) and to make consequential amendments to other Acts
C-39 (2014) Law Appropriation Act No.3 , 2014-15
C-39 (2012) Law Restoring Rail Service Act

Votes

Oct. 8, 2026 Passed 2nd reading of Bill C-39, An Act respecting certain measures to strengthen the economy

Debate Summary

line drawing of robot

This is a computer-generated summary of the speeches below. Usually it’s accurate, but every now and then it’ll contain inaccuracies or total fabrications.

Bill C-39 proposes coordinated federal reviews with targeted timelines for major projects, changes to transportation corridors, ports, trade digitization and security, and amendments to federal labour rules concerning bargaining, dispute resolution and worker protections.

Liberal

  • Supports faster project approvals: Supports a coordinated “one project, one review, one year” process to attract investment and build infrastructure faster, while maintaining environmental standards and Indigenous rights and consultation.
  • Modernizes trade corridors: Would designate national trade corridors, improve port governance and coordination, and digitize trade processes to reduce bottlenecks, strengthen supply chains and diversify exports beyond the United States.
  • Protects workers and bargaining: Supports earlier bargaining, mediation and stronger workplace protections to improve labour stability, while affirming workers’ right to strike and adding guardrails to exceptional government intervention.

Conservative

  • Supports building projects: Conservatives support faster construction, investment and jobs, but will judge Bill C-39 by measurable results rather than announcements, and say the previous Bill C-5 has delivered little.
  • Questions timeline guarantees: They argue the one-year approval promise is not binding: preparation occurs before the clock starts, and officials or cabinet can pause or extend it, leaving investors without certainty.
  • Wants deeper deregulation: Conservatives call for repealing Bills C-69 and C-48 and the industrial carbon tax, with one project, one review and firm approval deadlines instead of more bureaucratic workarounds.
  • Demands scrutiny of labour changes: Members warn that changes to section 107 could weaken collective bargaining and workers’ right to strike, and demand thorough committee study, consultation and safeguards before decisions are made.

NDP

  • Opposes bill C-39: The NDP argues the bill concentrates power in ministers, weakens workers’ rights, risks environmental safeguards and Indigenous rights, and transfers decision-making away from communities and independent experts.
  • Protects the right to strike: The party opposes codifying and expanding ministerial powers to end legal strikes, saying this undermines constitutionally protected rights, weakens workers’ bargaining leverage and discourages employers from negotiating fairly.
  • Safeguards environment and Indigenous rights: The NDP warns that fixed approval deadlines, weakened project conditions and accelerated consultation could harm ecosystems and compress Indigenous rights; it says meaningful consultation and environmental review are essential to responsible development.
  • Builds fairly and together: The party supports building housing, clean energy and infrastructure, but says nation-building must create good union jobs, respect Indigenous rights, protect the environment and include communities rather than prioritize speed and corporate rewards.

Bloc

  • Opposes Bill C-39: The Bloc will vote against Bill C-39, arguing that it uses the trade crisis to justify permanent changes that weaken environmental protections, workers’ rights and democratic accountability.
  • Environmental safeguards: The Bloc warns that rushed assessments, project pre-approval and shifting reviews to energy regulators undermine scientific independence, public consultation and the ability to prevent environmental harm.
  • Right to strike: The Bloc says the bill gives ministers broad discretion to end lawful strikes based on undefined national-interest criteria, weakening collective bargaining and shifting power toward employers.
  • Executive power and Quebec: The Bloc objects to concentrating authority in ministers and the Prime Minister, circumventing Parliament and laws, and intruding on Quebec and provincial roles in managing natural resources.

Green

  • Opposes rushed project approvals: The Green Party warns that Bill C-39 could direct billions in public money to projects without basic cost-benefit analysis, risking economic waste and serious environmental and Indigenous-rights harms.
  • Demands evidence and transparency: The party rejects the premise that speed is inherently beneficial, arguing that weak planning, political pressure and cabinet discretion without transparent evidence make major projects more likely to fail.
  • Protects environmental conditions: The Greens oppose amendments that make project approval conditions subject to tests of economic feasibility or practicality, warning proponents could challenge binding safeguards and weaken environmental laws.
  • Defends collective bargaining: The party supports the Canadian Labour Congress’s concerns about part 3’s threat to collective bargaining and the trade union movement, and calls for substantial amendments.
Was this summary helpful and accurate?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1 p.m.

Liberal

Doly Begum Liberal Scarborough Southwest, ON

Mr. Speaker, it is always an honour to rise on behalf of the good people of Scarborough Southwest, especially when it is to address challenges we are facing not only across my riding but across Canada.

Over the past several years, Canadians have witnessed how quickly events beyond our control and beyond our borders can affect our economy at home. A conflict, a war or atrocities on the other side of the world can disrupt energy markets on this side. A shortage of shipping capacity can increase costs for Canadian businesses. A disruption to rail lines, highways or ports can affect producers and consumers on both ends of the supply chain.

We have heard in the House, even this morning, about the bureaucracy and time constraints related to putting shovels in the ground. We need to ensure that we are addressing those challenges, and doing that fast and efficiently by streamlining the system. Across this country, Canadians are feeling the pressure of what is happening right now, and I am really excited to speak to Bill C-39, because we are addressing those challenges. With higher prices at grocery stores, small businesses having to make very difficult decisions or families having to sacrifice one thing for another just to make ends meet, we must try to ensure that Canadians' paycheques can cover all their costs and that they are able to pay their bills.

In the face of these global realities, our government was elected on a firm commitment to reinforce Canada's economic sovereignty and empower our country to build bigger, stronger and faster. Our supply chain is built from ports, railways, roads and, most important, the great workers who work so hard every single day to keep goods moving. They are the backbone of our economy. Over the past year and a half, our Prime Minister and our Liberal government have been moving at record speed to ensure Canadian economic resilience as the world becomes increasingly volatile.

Stronger supply chains are imperative to our government's ambitious plan to double non-U.S. exports, build major projects and attract record investments. This is why Bill C-39 is so important. The building Canada stronger act aims to do exactly that: further strengthen our existing supply chains while supporting good-paying jobs, helping Canadian businesses compete and keeping costs down for the hard-working people of our country.

Bill C-39 recognizes that our transportation network does not operate in isolation. Our ports, railways and roads are part of a connected system, and we need to start planning and investing in them that way. That means looking at the movement of goods across an entire corridor, identifying where the delays are and the capacity constraints occur, and measuring how the system is performing. The bill would also create a national trade corridors council to monitor trade disruptions, continuously identify bottlenecks and recommend improvements to the Minister of Transport.

As we invest in our trade infrastructure, these measures would ensure that those investments are directed toward the places where they would have the greatest impact. A congested port can mean additional storage costs. A lack of rail capacity can mean grain sitting in elevators rather than moving to markets. For small businesses, a shipment arriving late can result in loss of revenue, higher costs and a difficult decision-making process. Whether to pass on that cost to the consumers or to maybe lay off employees, it could mean the end of a business. It could be the end for a lot of local small businesses that had been running for 10, 20 or 30 years.

This summer I had an opportunity to visit a local business, Accuenergy, an electrical parts manufacturer in my riding of Scarborough Southwest. It has been run by a father and his son since 1998. Accuenergy supplies its products to over 170 countries around the world, and it employs more than 300 people. I had the opportunity, with the Minister of AI, to talk to some of the employees from my riding and from across Scarborough and the GTA. There are so many businesses like Accuenergy across Canada that are building right here at home, creating good-paying jobs and seeking to compete in markets around the world. As we ask businesses to diversify into new markets beyond the United States, our government has the responsibility of making sure our infrastructure can keep up with that ambition.

There are other major pieces in the bill that I would have loved to have highlighted, but I wanted to make sure to point out that what we hear in the House, such as the complaints from the other side about putting shovels in the ground and moving things faster, would be addressed by the bill. Bill C-39 would modernize our process to make sure we are able to get shovels in the ground, make decisions faster and get faster approvals so we can address the challenges people across this country are facing.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:05 p.m.

Conservative

Kelly McCauley Conservative Edmonton West, AB

Mr. Speaker, the Liberals talk about building things faster with Bill C-39. Why not get rid of the “no new pipelines” bill that was deemed mostly unconstitutional, Bill C-69, and get rid of the anti-Alberta bill, Bill C-48?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:10 p.m.

Liberal

Doly Begum Liberal Scarborough Southwest, ON

Mr. Speaker, I wish I had more time to speak to some of the things Bill C-39 would do about exactly some of the complaints we hear from the other side, such as to make sure that, first of all, we are uniting the entire country. Our Prime Minister is going coast to coast to coast to make sure that we are not only addressing challenges in Ontario, Manitoba, Quebec or Alberta but are also addressing challenges across different provinces and uniting the provinces. Another part of our goal has been to make sure we make trade easier between provinces as well.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:10 p.m.

Bloc

Christine Normandin Bloc Saint-Jean, QC

Mr. Speaker, my colleague mentioned that she did not have enough time to discuss the bill in its entirety. One might also wonder whether a year is enough time for scientists to properly assess the impact of any projects that might be launched, especially given that this one year allows for 300 days for assessment and reporting, and then 65 days for the minister to make a decision. That does not even allow for the four full seasons that would be needed to determine whether certain projects actually have an impact on the natural environment.

Does my colleague not see the risks involved in moving too quickly?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:10 p.m.

Liberal

Doly Begum Liberal Scarborough Southwest, ON

Mr. Speaker, this is why it is so important that we have a timeline. In the past, a lot of infrastructure costs have risen because of delays in our projects due to delays in the decision-making process. There are exceptional circumstances, and this is why the Minister of Transport would have the authority to be able to make those exceptional decisions. It is really important that at this time, a time of crisis, we are focusing on making sure we have a review process that has a timeline and that we get shovels in the ground, and this is exactly why the bill is really important.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:10 p.m.

Liberal

Steeve Lavoie Liberal Beauport—Limoilou, QC

Mr. Speaker, I thank my colleague for her very important speech on Bill C-39.

She talked a lot about market diversification. As we know, the government has signed more than 20 agreements over the past year. She also talked about grain, which is actually shipped through my riding. We also heard about the importance of speeding up projects, and she mentioned a company in her riding that does business around the world. I have noticed the same thing: Some businesses want to invest more and are asking for more predictability. Often, that predictability is measured in time. Bill C‑39 will actually help things move faster and will give businesses the predictability they need to invest and attract more investment here.

I would like my colleague to talk about what the government has done over the past year. I would also like to hear her thoughts on what Bill C‑39 will enable the government and Canada to do.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:10 p.m.

Liberal

Doly Begum Liberal Scarborough Southwest, ON

Mr. Speaker, my colleague is exactly right. The bill would address those challenges, those bottlenecks, that businesses face. Over the past year, previous legislation has also addressed these kinds of issues that we have faced.

An efficient supply chain is one of the key parts of making sure that we are focusing on our economy and strengthening our economy. Canada's long-term economic strength depends on reliable and efficient trade quarters, for example, and making sure that we are making decisions faster and being more effective. That is not just for domestic trades but also for international trade, to be able to attract new investors from across the world.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:10 p.m.

Green

Elizabeth May Green Saanich—Gulf Islands, BC

Mr. Speaker, I congratulate my hon. colleague from Scarborough Southwest again on her recent election. Knowing she has not read as many bills as I have in this place, I will say that I have never seen a bill drafted to be as deceitful as this one. I want to put it to her that it is odd that in the summary of what we can expect in the bill, page ii notes that division 2 of part 1 would amend the Building Canada Act, Bill C-5, to say, among other things, in section 99, that the sunset clause on bill C-5, the part that says that this bill would not have an effect five years from this date, would be repealed. It lists four things of less consequence than this one it does not mention.

Does my colleague have any comments on the impact of making the draconian power grabs of Bill C-5 permanent?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:10 p.m.

Liberal

Doly Begum Liberal Scarborough Southwest, ON

Mr. Speaker, I thank the member for her comments and, of course, for welcoming me to the House. There are a lot of things we agree on and some that, even if we disagree, I feel like we can sit together and come to terms on. We are all here to represent our communities and make sure that the people we represent are well served.

This bill addresses some of the challenges we are facing right now across this country, especially with the trade war with the U.S., but also challenges with the conflicts across the world.

It is important that we recognize the power we hold within this House. There are decisions we make in this House that are changed over time because of the needs coming from changes, which may be necessary in the future, and when that time comes—

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:15 p.m.

The Assistant Deputy Speaker John Nater

Unfortunately, we have run out of time.

Resuming debate, the hon. member for Saint-Jean.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:15 p.m.

Bloc

Christine Normandin Bloc Saint-Jean, QC

Mr. Speaker, I would like to begin by saying that Bill C-39 is the perfect example of a saying that often comes up in politics: Never let a good crisis go to waste. That is certainly the impression I am getting from the government side. The Liberals are using the President of the United States, Donald Trump, as a scare tactic—even though he is scary enough on his own—to justify permanent changes to our ways of doing things and our values. When I say “our”, I am referring to both Canada's and Quebec's ways of doing things and our values. Now that I have said that, I will return to the issue of the sunset clause.

A crisis that is already frightening enough for Canadians and Quebeckers is being used to justify major legislative changes that will shake the very foundations of the temple of values that we thought were otherwise secure and that took years to build. Now, they could crumble in the blink of an eye.

In a way, I find it hard to believe that people are surprised by this, since it is, after all, part of the DNA of successive governments to use crises to seize power for themselves. We have seen this in the past.

I would now like to take a moment to provide a bit of background.

Crises have often been used to centralize power within the federal government. Let me provide a bit of history. During the First World War, the War Measures Act was enacted, giving Ottawa powers that were otherwise generally reserved for the provinces, such as economic regulation, censorship, detention and internment.

In 1917, the federal government introduced a federal income tax, a measure that was allowed under the Constitution but that had never before been implemented by the federal government. It enacted the Income War Tax Act. It was meant to be a temporary measure, but it never went away. People still have to file two tax returns in Quebec, and one tax return everywhere else, which just goes to show that nothing is more permanent than a temporary solution.

We see this again with the sunset clause in Bill C-5, which called for the measures to expire after five years. Under Bill C-39, they will become permanent.

In 1930, during the Great Depression, the government of Richard Bedford Bennett tried to centralize power even further on the premise that Ottawa needed to have significant economic and social capacity so it could function as a kind of welfare state.

In 1940, after the crisis, the provinces transferred employment insurance to the federal government. During the Second World War, Canada managed to persuade the provinces to temporarily surrender more tax room in return for making transfer payments to the provinces to fund the wartime economy. That never went away either, and it eventually became what we now know as the “spending power”.

A bit more recently, and closer to home, was the 2008-09 financial crisis, the infamous asset-backed commercial paper crisis. Once again, the federal government tried to take control of an exclusively provincial jurisdiction, securities regulation, by creating a Canada-wide securities commission, a move firmly opposed by Bloc Québécois. In fact, the Supreme Court later declared it unconstitutional.

Even more recently, during COVID‑19, the federal government used its spending power to control, legislate and regulate jurisdictions outside its authority, including standards in nursing homes and long-term care facilities. It wanted to establish national standards that the provinces would have to meet in order to receive transfers, even though the provinces are the ones responsible for delivering care to the public.

As history has shown us, crises have often been used to justify things that would otherwise have been considered unacceptable. Bill C‑39 is no exception, particularly when it comes to the environment. I am going to talk a bit about that.

In the past, powers that belonged to the provinces were centralized. Now, however, powers that would otherwise belong to the House or to other ministers and agencies are being centralized and often concentrated in the hands of a single minister, or even the Prime Minister.

All of this is allegedly being done as a way to deal with Donald Trump and the trade war, at a time when Canada wants to attract more investors. The government is saying that we are moving far too slowly, that we need to lower barriers in order to keep the economy healthy, and that this will not start until Donald Trump is gone. The government is therefore implementing measures that will last forever to solve a problem that, basically, is only temporary.

For example, the government is chipping away at certain environmental pillars that we thought were firmly established. It is speeding up project assessment to the extreme, as I mentioned in my questions a little earlier. It is introducing a one-year time frame for granting permits for major projects. One year means 300 days to carry out assessments and draft the reports to be submitted to the minister, who must then make a decision within 65 days.

I mentioned earlier that when a decision is made to grant a permit for a major project, the assessment of potential environmental impacts will not even cover four full seasons. Compliance with numerous laws is also going to be optional for regions designated as being of national interest. It is not clear exactly what constitutes a region of national interest. Included in those laws are the Fisheries Act; the Migratory Birds Convention Act, 1994; the Canadian Environmental Protection Act and the Species at Risk Act.

We will also be relying on far fewer impartial experts to decide whether a project will move forward. The government is completely disregarding the expertise of the Impact Assessment Agency of Canada when it comes to pipelines, for example, and will be relying exclusively on the Canada Energy Regulator. However, I would like to remind the House that the CER's mission is to keep energy moving safely and efficiently through this country's pipelines and power lines. Its mandate is to promote energy, not to protect the environment or impartially assess the impact of a project, like the agency did. I should note that five of the CER's seven commissioners used to work for oil companies, so I think it is safe to assume that they will have a definite bias when making decisions.

A lot of decisions that used to be made by the Governor in Council will now be made by a single minister. Changes have been made to what ministers can do. I would like to quickly refer my colleagues to the document that was provided by the government itself, the summary of Bill C-39.

There was a time when the Department of the Environment issued a statement on the decision it was making under the Impact Assessment Act, but the other departments issued the permits. Now, everything is in the hands of the environment minister, who will make a single decision. In the past, work could not begin until the assessments were completed, but now the environment minister will have the power to authorize work to begin in advance, even before the permits are issued. In the past, we have had environment ministers who were staunch supporters of the oil sands, such as Peter Kent. We should therefore not assume that just because someone is an environment minister, they will make decisions that are good for the environment, particularly if those decisions are ultimately made by the Prime Minister.

We know that, previously, the minister could only modify the conditions imposed on a project as long as there was no adverse impact on the environment. Now, however, these kinds of changes can be authorized if the minister decides they are in the public interest. Ministers used to be able to attach conditions to assessment and permit decisions. Now, however, decision-making authorities will have to consider the technical, economic and practical feasibility of any conditions they impose on proponents who want to roll out projects.

This goes to show that the bar has been significantly lowered. The government is basically tearing down the fences around the chicken coop and hoping that the foxes will not attack them. That is what we are hearing from the Liberal benches. The Liberals deny that they are lowering environmental standards. However, certain laws can be circumvented. They say that they simply hope it will not happen.

I could have spoken a lot longer. I am only halfway through the third page of my presentation, and I have not even addressed the labour law issue. The Liberals say that they are going to keep protecting the right to strike, just as they say that they are going to keep protecting freedom of expression, provided that no one hears the protesters protesting. The right to strike will be protected, unless the strike disrupts the national interest. What that is, we do not know. It could simply mean any economic disruption, but a strike without disruption is not a strike.

Since I have only a few seconds left, unfortunately, I must conclude my speech by reiterating that the government wants to speed things up and is using the trade war as a pretext, even though it will be over by the time we see the consequences. At the end of the day, whose interests will this national interest really serve, apart from the Prime Minister's? It is not hard to imagine that the public will suffer many negative consequences in the short, medium and long terms.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:25 p.m.

Liberal

Steeve Lavoie Liberal Beauport—Limoilou, QC

Mr. Speaker, I listened carefully to my colleague's speech, which could be summed up quickly in one phrase: status quo. What is being sought here is the status quo or, as the saying goes, doing the same thing over and over again and expecting a different result.

My colleague talked about a crisis. She said it was the crisis that brought this to light. Yes, the crisis may have highlighted the inefficiencies of the construction sector in Canada. Just building has become difficult. Now we want to build faster because, when it comes to predictability in contracts, projects that take eight to 10 years to get off the ground always end up failing. I would perhaps invite my colleague to read an interesting book by Ezra Klein called Abundance, which highlights this point.

The question I would like to ask my colleague is this: What would she change? What specific measures would she include in a bill to speed up projects?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:25 p.m.

Bloc

Christine Normandin Bloc Saint-Jean, QC

Mr. Speaker, I do not claim to be able to write a 249-page bill on my own, but I am willing to acknowledge that there are some good points in the bill. For example, the unions have acknowledged that there are certain positive measures, such as bargaining unit protection when contractors are replaced. There are some small positive aspects to the bill, but overall, it is a tough pill to swallow.

Again, we are not opposed to the economy performing well or to accelerating certain projects. However, this cannot be done at any cost, and certainly not by trimming all environmental protections, especially when we know from a report by the Institut de recherche en économie contemporaine that groceries are 8.4% more expensive due to climate change, that insurance costs are much higher, that Canada is now paying $2 billion for insurance in disaster-stricken areas, and that this figure is expected to reach $15 billion in the future.

Exactly whose interest are the Liberals referring to when they talk about the national interest?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:25 p.m.

Conservative

Kelly McCauley Conservative Edmonton West, AB

Mr. Speaker, my colleague brought up a lot of very valid points. One of them, of course, is that there is not a lot of structure. Despite the bill being 250 pages, there are a lot of areas where it would allow the bureaucracy or the ministers to make additional decisions. What is going to be in the national interest? Someone is going to be allowed to extend this magical one-year permit timeline at any time.

I wonder if my colleague could spend a bit of time explaining the need to have clear direction in the rules and not allow so much leeway for ministers, the government or bureaucrats to mess around with the legislation.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 1:25 p.m.

Bloc

Christine Normandin Bloc Saint-Jean, QC

Mr. Speaker, that is an excellent question. In fact, it is something that the President of the United States has been criticized for: governing by executive order by giving himself powers that would otherwise have been counterbalanced by lawmakers.

That is exactly what the government is doing with this bill. To protect ourselves from Donald Trump, we are turning into Donald Trump. That is a terrible idea. The government is doing this under the pretense of boosting the economy and dealing with a situation that is likely to change in the short term, or so we hope. Nevertheless, the government is repealing the five-year sunset clause that was previously put in place. Significant changes are therefore becoming permanent and, to top it all off, the government is making these changes in an omnibus bill that combines environmental law with labour law. All this is being done under the pretense of dealing with a crisis that we hope will soon be over.