Part 1 implements certain measures in relation to project evaluations.
Division 1 of Part 1 amends the Impact Assessment Act to, among other things,
(a) provide that the Canadian Nuclear Safety Commission is to conduct the impact assessment of a designated project that includes activities that are regulated under the Nuclear Safety and Control Act ;
(b) authorize the Minister of the Environment to grant certain federal authorizations that are required in respect of a designated project at the same time that the Minister issues a decision statement in respect of the project;
(c) ensure that a decision statement in respect of a designated project for which the Impact Assessment Agency of Canada conducts the impact assessment is issued within one year after the proponent provides the required information or studies;
(d) provide for the coordination of the impact assessment of designated projects and the review processes for certain federal authorizations that are required in respect of those projects; and
(e) provide for the coordination of consultations with Indigenous groups.
Division 2 of Part 1 amends the Building Canada Act to, among other things,
(a) establish, for certain types of projects located within a region of national interest, a similar framework to the one applicable to national interest projects;
(b) allow the minister designated under that Act to add, remove or amend any condition in respect of an authorization that was granted for a national interest project before the name of that project was added to Schedule 1 to that Act;
(c) ensure that obligations to make information public associated with decisions made under that Act are administratively feasible; and
(d) authorize the Governor in Council to add the name of a region to a new schedule to that Act if the Governor in Council is of the opinion, having regard to certain factors, that the designation of that region is in the national interest.
Division 3 of Part 1 amends the Canadian Energy Regulator Act to, among other things,
(a) ensure decisions in respect of pipelines, designated power lines and offshore renewable energy projects are issued within one year of receiving the required information and studies;
(b) provide for the coordination of consultations with Indigenous peoples of Canada in respect of pipelines, designated power lines and offshore renewable energy projects;
(c) provide for the coordination of federal authorizations in respect of pipelines, designated power lines and offshore renewable energy projects with federal authorities;
(d) provide that the Commission is the sole assessor of applications in respect of pipelines, designated power lines and offshore renewable energy projects;
(e) provide authority for the Commission to
(i) make decisions in respect of applications relating to pipelines, designated power lines and offshore renewable energy projects, unless otherwise specified in the Act,
(ii) exempt certain pipelines or branches of or extensions to pipelines from the application of certain provisions, and
(iii) integrate a detailed route hearing into an ongoing hearing; and
(f) provide that the Governor in Council is to determine whether certain pipelines and designated power lines are in the public interest.
It also makes consequential amendments to the Federal Courts Act and the Northern Pipeline Act .
Division 4 of Part 1 amends the Canadian Navigable Waters Act to require the Minister of Transport to, among other things, take into account the feasibility of the terms and conditions in respect of an approval relating to certain works. It also transfers to that Minister the power to exempt bodies of water from the application of certain provisions of the Act if that Minister is satisfied that it would be in the public interest. Finally, it allows the Governor in Council to make regulations to exclude structures, devices or other things from the definition “work” to avoid duplication with other Acts and regulations.
Division 5 of Part 1 amends the Canadian Environmental Protection Act, 1999 to, among other things,
(a) ensure that environmental protection compliance orders may be issued with respect to any thing to which that Act applies and to non-continuing offences, including with respect to contravening imports;
(b) broaden the scope of such orders by permitting an enforcement officer to direct a person to take additional measures, such as managing contravening imports in the manner specified in the order, returning them to their place of origin or removing them from Canada; and
(c) provide that certain permits issued under that Act may, in certain circumstances, be valid for more than one year.
Division 6 of Part 1 amends the Species at Risk Act to, among other things, require the competent minister to take into account the feasibility of the terms and conditions in respect of certain agreements and permits.
Division 7 of Part 1 amends the Fisheries Act to, among other things,
(a) modify the fish habitat bank regime to allow for the use of habitat credits by third parties;
(b) authorize the making of regulations respecting the circumstances in which a person who is authorized to carry on a work, undertaking or activity may pay a fee to offset adverse effects on fish and fish habitat and provide for these fees to be credited to the Environmental Damages Fund; and
(c) transfer certain regulation-making powers from the Governor in Council to the Minister of Fisheries and Oceans.
Part 2 implements certain measures in relation to supply chains.
Division 1 of Part 2 amends the Department of Transport Act to provide the Minister of Transport with the power to establish a transportation project office that coordinates review processes for federal authorizations and consultations with respect to transportation projects.
Division 2 of Part 2 amends the Canada Transportation Act to, among other things,
(a) provide that the Minister of Transport may designate geographic areas as trade corridors and establish the National Trade Corridors Council, whose mandate is to monitor the movement of goods in trade corridors, analyze disruptions that may affect trade corridors and make recommendations and provide advice to that Minister;
(b) provide that Minister with the authority to make regulations to give effect to international standards or ensure compliance with Canada’s international obligations;
(c) expand the purposes for which that Minister may request that federal departments and agencies provide information that has already been provided by regulated entities to those federal departments and agencies;
(d) clarify the application of the requirement to notify that Minister of proposed transactions involving transportation undertakings;
(e) reduce the threshold for the requirement to notify that Minister and the Commissioner of Competition of proposed transactions involving transportation undertakings situated in a “port”, as defined in section 5 of the Canada Marine Act ;
(f) provide that that Minister may, for any purpose related to transportation security or safety, to the integrity of the national transportation system or to public safety or for any purpose specified by order, grant, suspend or cancel security clearances;
(g) authorize, for the purposes of administering and enforcing the security clearances regime, certain individuals or entities to collect information from and disclose information to each other;
(h) authorize the Governor in Council to make regulations respecting security clearances;
(i) expand the exceptions to the requirement to obtain the Canadian Transportation Agency’s approval for the construction of railway lines; and
(j) establish, for a period of four years, a zone in Manitoba, Saskatchewan and Alberta in which any interswitching that occurs is subject to the rate determined by the Canadian Transportation Agency.
Division 3 of Part 2 amends the Canada Marine Act to, among other things,
(a) authorize the Governor in Council to allow a port authority to enter into joint-liability arrangements and to create entities other than wholly-owned subsidiaries to undertake activities within or outside the limits of the port;
(b) authorize the Minister of Transport to appoint certain directors of a port authority;
(c) add principles that a port authority must observe when fixing port fees and expand the grounds on which a fee-related complaint may be filed with the Canadian Transportation Agency;
(d) authorize the Governor in Council to appoint, in certain circumstances, an administrator for a not-for-profit corporation that has entered into an agreement in respect of the St. Lawrence Seaway;
(e) authorize that Minister to terminate such an agreement or any part of one and provide for a dispute resolution process to deal with any disputes arising from the termination; and
(f) authorize that Minister to require that any of the following persons take measures to prevent or mitigate certain threats or stop any activity that would contribute to such threats:
(i) a port authority,
(ii) a person in charge of a port facility,
(iii) a person responsible for the management and operation of all or part of the St. Lawrence Seaway or for any works, undertakings or property used in the operation of the Seaway,
(iv) an occupier or person in charge of any federal real property, or any federal immovable, that is subject to being administered under Part 3 of that Act.
It also makes consequential amendments to the Port Authorities Operations Regulations .
Division 4 of Part 2 amends the Marine Liability Act to, among other things,
(a) modify the definition “receiver” to refer to the person who physically receives bulk hazardous and noxious substances carried by sea as cargo and discharged at a port or terminal in Canada; and
(b) harmonize the inspection and enforcement provisions relating to that person.
It also makes related amendments to the Safeguarding Canada’s Seas and Skies Act .
Division 5 of Part 2 amends the Coasting Trade Act to allow foreign ships or non-duty paid ships to engage, without a licence, in activities in response to a declared emergency.
Division 6 of Part 2 repeals the Shipping Conferences Exemption Act, 1987 and makes a consequential amendment to the Access to Information Act .
Division 7 of Part 2 amends the International Bridges and Tunnels Act to allow the Minister of Transport to make certain decisions that were previously made exclusively by the Governor in Council.
Division 8 of Part 2 enacts the Enabling Digital Trade Act which, among other things,
(a) sets out the rules for the use of electronic trade documents as the functional equivalents to paper trade documents that are related to trade in goods;
(b) eliminates the requirement to provide information to the Government of Canada in physical form in relation to the importation or exportation of goods; and
(c) permits a federal minister, or an officer or employee of a department or agency of the Government of Canada, to disclose information that is related to the importation or exportation of goods if the receiving minister, department or agency of the government is permitted by law to collect that information.
Part 3 implements certain measures related to the work force.
Division 1 of Part 3 amends the Canada Labour Code to, among other things,
(a) establish new requirements and timelines related to collective bargaining;
(b) provide for the transfer of certain rights in the context of certain contractors being replaced by new contractors;
(c) establish new requirements and authorities in relation to entering into first collective agreements;
(d) provide that the Canada Industrial Relations Board may certify a trade union as the bargaining agent for existing bargaining units in certain industries in certain geographic areas on application of two or more employers, on referral of the Minister of Labour or on that Board’s initiative;
(e) confer on the Minister of Labour the power to appoint a special mediator to assist parties in settling a dispute that arises in connection with the entering into, renewal or revision of a collective agreement; and
(f) establish new requirements for that Minister to direct the Canada Industrial Relations Board to take measures under section 107 of that Act.
It also makes consequential amendments to certain regulations.
Division 2 of Part 3 amends the Canada Labour Code to, among other things,
(a) authorize the Head of Compliance and Enforcement to issue a settlement enforcement order requiring an employer or director of a corporation to pay any outstanding amounts that are to be paid under a settlement with an employee; and
(b) permit an order to debtor to be issued, in certain circumstances, before a settlement enforcement order or payment order has been issued.
Division 3 of Part 3 provides that Division XIII of Part III of the Canada Labour Code does not apply to an employer and employees who are parties to a collective agreement that confers rights and benefits at least as favourable as those conferred by that Division XIII with respect to medical leave of absence with pay.
Division 4 of Part 3 amends the Wage Earner Protection Program Act to, among other things, define the term “former employer” for the purposes of that Act and to specify that the Minister may confirm, vary or rescind a determination of eligibility even without a request for review.

Elsewhere

All sorts of information on this bill is available at LEGISinfo, an excellent resource from Parliament. You can also read the full text of the bill.

Bill numbers are reused for different bills each new session. Perhaps you were looking for one of these other C-39s:

C-39 (2023) Law An Act to amend An Act to amend the Criminal Code (medical assistance in dying)
C-39 (2017) An Act to amend the Criminal Code (unconstitutional provisions) and to make consequential amendments to other Acts
C-39 (2014) Law Appropriation Act No.3 , 2014-15
C-39 (2012) Law Restoring Rail Service Act

Votes

Oct. 8, 2026 Passed 2nd reading of Bill C-39, An Act respecting certain measures to strengthen the economy

Debate Summary

line drawing of robot

This is a computer-generated summary of the speeches below. Usually it’s accurate, but every now and then it’ll contain inaccuracies or total fabrications.

Bill C-39 proposes coordinated federal reviews with targeted timelines for major projects, changes to transportation corridors, ports, trade digitization and security, and amendments to federal labour rules concerning bargaining, dispute resolution and worker protections.

Liberal

  • Supports faster project approvals: Supports a coordinated “one project, one review, one year” process to attract investment and build infrastructure faster, while maintaining environmental standards and Indigenous rights and consultation.
  • Modernizes trade corridors: Would designate national trade corridors, improve port governance and coordination, and digitize trade processes to reduce bottlenecks, strengthen supply chains and diversify exports beyond the United States.
  • Protects workers and bargaining: Supports earlier bargaining, mediation and stronger workplace protections to improve labour stability, while affirming workers’ right to strike and adding guardrails to exceptional government intervention.

Conservative

  • Supports building projects: Conservatives support faster construction, investment and jobs, but will judge Bill C-39 by measurable results rather than announcements, and say the previous Bill C-5 has delivered little.
  • Questions timeline guarantees: They argue the one-year approval promise is not binding: preparation occurs before the clock starts, and officials or cabinet can pause or extend it, leaving investors without certainty.
  • Wants deeper deregulation: Conservatives call for repealing Bills C-69 and C-48 and the industrial carbon tax, with one project, one review and firm approval deadlines instead of more bureaucratic workarounds.
  • Demands scrutiny of labour changes: Members warn that changes to section 107 could weaken collective bargaining and workers’ right to strike, and demand thorough committee study, consultation and safeguards before decisions are made.

NDP

  • Opposes bill C-39: The NDP argues the bill concentrates power in ministers, weakens workers’ rights, risks environmental safeguards and Indigenous rights, and transfers decision-making away from communities and independent experts.
  • Protects the right to strike: The party opposes codifying and expanding ministerial powers to end legal strikes, saying this undermines constitutionally protected rights, weakens workers’ bargaining leverage and discourages employers from negotiating fairly.
  • Safeguards environment and Indigenous rights: The NDP warns that fixed approval deadlines, weakened project conditions and accelerated consultation could harm ecosystems and compress Indigenous rights; it says meaningful consultation and environmental review are essential to responsible development.
  • Builds fairly and together: The party supports building housing, clean energy and infrastructure, but says nation-building must create good union jobs, respect Indigenous rights, protect the environment and include communities rather than prioritize speed and corporate rewards.

Bloc

  • Opposes Bill C-39: The Bloc will vote against Bill C-39, arguing that it uses the trade crisis to justify permanent changes that weaken environmental protections, workers’ rights and democratic accountability.
  • Environmental safeguards: The Bloc warns that rushed assessments, project pre-approval and shifting reviews to energy regulators undermine scientific independence, public consultation and the ability to prevent environmental harm.
  • Right to strike: The Bloc says the bill gives ministers broad discretion to end lawful strikes based on undefined national-interest criteria, weakening collective bargaining and shifting power toward employers.
  • Executive power and Quebec: The Bloc objects to concentrating authority in ministers and the Prime Minister, circumventing Parliament and laws, and intruding on Quebec and provincial roles in managing natural resources.

Green

  • Opposes rushed project approvals: The Green Party warns that Bill C-39 could direct billions in public money to projects without basic cost-benefit analysis, risking economic waste and serious environmental and Indigenous-rights harms.
  • Demands evidence and transparency: The party rejects the premise that speed is inherently beneficial, arguing that weak planning, political pressure and cabinet discretion without transparent evidence make major projects more likely to fail.
  • Protects environmental conditions: The Greens oppose amendments that make project approval conditions subject to tests of economic feasibility or practicality, warning proponents could challenge binding safeguards and weaken environmental laws.
  • Defends collective bargaining: The party supports the Canadian Labour Congress’s concerns about part 3’s threat to collective bargaining and the trade union movement, and calls for substantial amendments.
Was this summary helpful and accurate?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:05 p.m.

Conservative

Warren Steinley Conservative Regina—Lewvan, SK

Mr. Speaker, I want to thank my friend and colleague for his great speech.

The fact is, with the team Canada approach by the Liberals, there has never been a more divisive prime minister in the history of our country. There is a separation issue in Quebec. There is a separation issue in Alberta. The Prime Minister has divided our country along regional lines ever since he was elected 18 months ago.

This is exactly the same legislation as Bill C-5, which talked about building at speeds never seen before. These guys have 500 projects at the Major Projects Office, and they have approved none of them. Why?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:05 p.m.

Conservative

Jeremy Patzer Conservative Swift Current—Grasslands—Kindersley, SK

Mr. Speaker, with the Liberal government, it continues to be all rhetoric with no results.

Again, getting back to taking bold action, the government has done nothing when it comes to bold action. In fact, the environment minister herself is an active ally for the movement to try to end any development in the oil sands. She hates the oil sands. It is even on her own website that she does not want to see any more development in the oil sands. She is very much anti-oil and anti-gas.

The Liberal government still has the same anti-energy activists in the government, in cabinet, still forcing some of these decisions. That is what is leading a lot of the destruction of Canadian industry and the Canadian economy. That is why a lot of the divides continue to exist in this country. This country needs a unifying prime minister. and it is certainly not the one who is sitting over there.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:05 p.m.

Conservative

Shannon Stubbs Conservative Lakeland, AB

Mr. Speaker, I am pleased to join the debate today on behalf of the people of Lakeland. I hear every day from workers, farmers, families and business owners who know what is at stake when Canada cannot get major projects built. For more than a decade, Liberal laws and red tape have made it harder to build, invest and compete. That costs the people of Lakeland and Canadians everywhere jobs, businesses, higher prices and hope. After imposing layers of antidevelopment laws, taxes and delays, the Liberals seem to have finally discovered Canada must build for our own affordability, security and self-sufficiency.

Conservatives, of course, agree. We have always pushed for more competitive regulatory and fiscal frameworks so Canada can have pipelines, mines, LNG, nuclear power and better ports, railways, highways, airports and trade corridors to move Canadian resources and goods across the country and to global markets that want our products. What Canadians do not need is yet another announcement or agreement pretending the last 11 years never happened. There is no doubt the federal government could have implemented real major project fast-tracking measures immediately when it took office and should have listened to economists, industry experts, provincial leaders, us and other countries years ago.

Let us be clear. What has not changed? The Liberals have not repealed the unconstitutional Impact Assessment Act, the west coast oil shipping ban or the federal industrial carbon tax. Those are core parts of the Liberal antidevelopment agenda that Conservatives have always fought. They prolong uncertainty, increase dependence on one customer and undermine Canada's competitiveness, distinctly not what other major producing countries or the U.S. inflict on their businesses or entrepreneurs. I have cautioned the damage that the Liberals would do and pushed for change at every step.

In 2017, I fought Bill C-55 and antidevelopment zones that prohibit Canadian opportunities in water, often near regions where those are most important.

In 2018, I warned repeatedly that Bill C-69's so-called concrete timelines were anything but, since assessments could be stopped, extended and restarted at any time, making it totally uncertain for proponents and investors. Eight years later, proponents faced the same problems. The power to consider any other matter the agency decides is relevant obviously makes it impossible for investors to prepare, and removes efficiency and predictability from reviews.

In 2018, I fought Bill C-48, the Liberal oil shipping ban, which the most impacted B.C. north coast first nation sued the Liberals over for its own rights and title to pursue its own economic opportunities, and prevented Canada from reaching vast Asian markets to reduce dependence on the U.S. in the most direct, affordable and efficient route. It is still law today.

The federal industrial carbon tax remains too, the only one in the world for a major energy producer, which makes everything more expensive for Canadians and businesses.

The Liberals have prolonged uncertainty despite the clarity and consistency of Canadian industry in the case for regulatory and fiscal change, and even in the face of challenges from Canada's biggest customer and trading partner.

Nine months ago, with the MP for Long Range Mountains, I moved our Canadian economic sovereignty motion to repeal the Impact Assessment Act, the shipping ban and the federal industrial carbon tax. The Liberals opposed it and every single one is in place today. Therefore, when the Liberals called Bill C-39 a dramatic break from their own past, let us look at what remains. This is the Liberal illusion, new language, new announcements, releases and rhetoric, but the same antidevelopment architecture, barriers and growing bureaucracy.

Now the Liberals promise one project, one review, one year, which has been what Conservatives have proposed for years and ran on in 2025. However, the truth is the review clock would not start until proponents completed their comprehensive application, studies and permit information, work that can take years. Once it starts, the minister could add up to 90 days, cabinet could extend it further and timelines could be suspended. What good is a one-year promise if the clock starts years into the process and can stop along the way? That is still a stopwatch the government would control completely and proponents could not count on.

I warned about this with Bill C-69 eight years ago. In June last year, I tried again with respect to Bill C-5. I put forward amendments for a 90-day designation decision and a one-year conditions timeline. The Liberals rejected both. More than a year later, Canadians are right to ask: Where are the results and what on earth is taking so long?

Conservatives collaborated, helped improve and ultimately supported Bill C-5, because Canada must build urgently. The Liberals said that law and their Major Projects Office would get it done. Conservatives implemented greater transparency, conflict of interest, national security safeguards, indigenous participation and reporting on timelines and outcomes. We worked with the Bloc to protect provincial jurisdiction. That was in June 2025. Where are the results?

Since then, at committee, the government has confirmed that roughly 100 people work at the Major Projects Office, with a budget of over $200 million. The head of the MPO said that 275 applications had already come in from all sources, sectors and jurisdictions. The Liberals seem to celebrate this, but really, the fact that there are 275 applications of all kinds and from all over shows chaos not clarity. Today, the MPO acknowledges only 18 projects and eight strategies. Many were already under way before the office existed. Others are concepts with no final investment decision and no shovels in the ground.

Which projects actually moved because of the MPO, and what measurable outcomes did taxpayers get? Announcements are not outcomes. Meanwhile, at least 500 projects are waiting on the Prime Minister's desk before projects at the Canada Energy Regulator, the Canadian Nuclear Safety Commission and the Impact Assessment Agency are even counted.

Although the sector remains the biggest investor in Canada's economy, it is about even more than oil and gas. Manufacturers need reliable rail. Farmers and exporters need ports and trade corridors to work efficiently for lower costs. Communities need highways, water and waste-water infrastructure. The entire economy needs power and transmission lines. For years, Conservatives have said that infrastructure and natural resource development are not obstacles to Canada's security and sovereignty; they are the foundations.

Canada's competitiveness and productivity problem is not new. A 2024 analysis using the federal major projects inventory found nearly $670 billion in natural resource projects suspended or cancelled since 2015. Finance Canada itself says that Canadian business investment has stagnated while U.S. investment rose and outpaced Canada's. That matters even more amid U.S. trade uncertainty while the Liberals keep domestic antidevelopment taxes and regulatory barriers in place.

Canada cannot control what the U.S. or other countries do, so Canadian governments should resolve to compete and beat them at home. CNRL says it directly. Two Canadian oil sands expansions of 240,000 barrels a day are on hold, waiting for more effective and efficient regulation, and a competitive fiscal framework. Canada could unleash that investment right now, but it is blocked, not building. Meanwhile, competitors proved that projects can move faster. TC Energy's 700-kilometre southeast gateway pipeline in Mexico began construction eight months after permit application, and it entered service in under three years. Canada should be able to compete.

Canada has done it before, under a different government. During the global financial crisis, 23,500 infrastructure projects were completed. They went from concept to completion in under two years. That is why Conservatives call for one and done: one project, one approval and one year, with a real deadline. The west coast pipeline proves the point. On October 1, the government finally listed a west coast oil pipeline as a project of national interest.

Conservatives support another pipeline to the Pacific. We have argued for years for diversified export markets and pipelines built by the private sector in all directions, but Canadians should note what is happening here: The Liberal government and the Crown corporation once again have to build a pipeline because private sector proponents will not fully take it on. For years, those proponents faced an uncertain Impact Assessment Act, and Conservatives warned that it would drive away investment. Another pipeline to the Pacific was obviously in Canada's national interest years ago. Canada needed market diversification years ago.

Canadian energy has always been the key for security, sovereignty, affordability and leverage. The Liberals must create conditions for private capital to build, not make governments project owners because their own policies drive investment away.

Canadians know the difference between an announcement and an outcome. A designation is not construction. An MOU is not a pipeline. A project on a list is not a project being built. Canadians want shovels in the ground. The federal government must do its own constitutional obligation of indigenous consultation to get to yes. If consultation is one reason a federal clock can stop, the government must deliver its part promptly and consistently, and it cannot use its own duty as an excuse for indefinite delay.

Since the Liberals decide which projects receive special treatment, Canadians deserve transparency about conflicts of interest, ownership, foreign-state-owned investment and whether any Brookfield-related conflict screen applies. That is why Conservatives fought for those safeguards in Bill C-5. There is no doubt that Conservatives want Canada to build, not a headline deadline with years hidden before it and pause buttons built in. We want Canadian workers to build Canadian pipelines, ports, railways, highways, mines, nuclear plants, transmission lines and trade corridors with Canadian materials, but Bill C-39 would not get rid of the bad laws that are the problem in the first place.

The Liberals cannot say they were not warned. Canada has lost enough time. Stop blocking, stop taxing and stop delaying. Give proponents certainty, and bring private investment back to Canada.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:15 p.m.

Winnipeg North Manitoba

Liberal

Kevin Lamoureux LiberalParliamentary Secretary to the Leader of the Government in the House of Commons

Mr. Speaker, that is a lot of fast talk and no doubt a lot of words. I will pick up on some of the things the member was commenting on.

The member talked about getting oil to the Pacific Ocean. Stephen Harper was 10 years in government, and not one inch of pipeline was built directly to the Pacific or the coastline.

Now, we can talk about TMX. We can talk about LNG. Let us talk about the time since the last federal election. A newly elected Prime Minister has done more in 18 months than Stephen Harper did in 10 years, quite frankly, when it comes to economic development and the creation of literally close to a trillion dollars of potential investment. That is what has taken place in the last 18 months.

We can talk about the Pacific link. We can talk about LNG phase two. What is the member talking about—

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:15 p.m.

The Deputy Speaker Tom Kmiec

I have to interrupt the member to give a chance to the member for Lakeland to respond.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:15 p.m.

Conservative

Shannon Stubbs Conservative Lakeland, AB

Mr. Speaker, the Liberal member is not telling the truth about either the last 11 years or the previous record. The fact is that private sector proponents made proposals for a dedicated Asian export pipeline off the west coast. Also, the private sector proponents made a proposal for a west-to-east pipeline to provide Canadian domestic energy security and exports to Europe. The court ruled that there had to be more indigenous consultation done on northern gateway. Prime Minister Trudeau had the option to redo that consultation, get it right, and Canada would long be shipping barrels of oil to Asia to diversify markets beyond the U.S., on the private sector's dime, on their time, and that infrastructure would have been built years and years ago. Instead, the only thing the Liberals have a record of is chasing out private sector proponents and putting Crown corporations and taxpayers on the hook, and no shock—

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:15 p.m.

The Deputy Speaker Tom Kmiec

Questions and comments, the hon. member for Abitibi—Témiscamingue.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:15 p.m.

Bloc

Sébastien Lemire Bloc Abitibi—Témiscamingue, QC

Mr. Speaker, there is one thing I do not understand.

I do not understand why the Conservatives seem so angry. We can hear it. It is palpable. They are angry. Why are they angry? They seem angry that the government wants to bypass environmental assessments in order to build pipelines. However, I always thought that was the main objective of their political agenda.

I would like to hear an explanation.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:15 p.m.

Conservative

Shannon Stubbs Conservative Lakeland, AB

Mr. Speaker, the current situation is that the Liberals have just created more uncertainty and more chaos. Whatever happened in this country to what was a world-renowned, independent, impartial, objective and evidence-based regulatory body that made recommendations? Instead, what the Liberals are doing is centralizing power so that politicians are picking pet projects. They have a 100-person, $200-million Major Projects Office, which calls itself a concierge, while they have three existing regulators and more than 70 projects with private sector proponents that are stuck in front of those regulators right now with no end in sight. The Prime Minister himself said that there are 500 projects sitting on his table since they started this whole hullabaloo.

The point is: streamline the regulations, fix the laws, get rid of the anti-competitive taxes and bring private sector investment back to Canada for unity, sovereignty, security and leverage abroad.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:20 p.m.

Conservative

Dan Albas Conservative Okanagan Lake West—South Kelowna, BC

Mr. Speaker, these are important issues for our country and to the member's area.

In Bill C-39, we see an increase in the bureaucracy in section 2. We see that the Liberals want more discretionary powers given to ministers, and so powers going from the legislative branch to the executive and even some very wide-reaching powers that we agreed to give them on a temporary basis. If members remember, on Bill C-5, the Liberals, at the time when they were accused of grabbing too much power, said, “Oh, we'll put in a sunset clause for five years.” Well, in Bill C-39, they are removing that and saying that they will only use those large-scale powers to exempt projects from huge, important laws. The only limit now would be the dissolution of Parliament or prorogation of Parliament.

Does the member think that the Liberals are being a little too cute by saying, “On those powers, we put in a sunset clause”, and now they are basically taking all that power back again and more?

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:20 p.m.

Conservative

Shannon Stubbs Conservative Lakeland, AB

Mr. Speaker, I thank the member for all the work he has been doing on the bill before us and also on Bill C-5 when we worked together on that legislation.

The member has made the exact point about the fact that, right now, everything is as uncertain as ever for private sector proponents, for developers of major infrastructure and for resource development. I think the member has, very importantly, pointed out what is actually the agenda of the Liberals, and it is central—

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:20 p.m.

The Deputy Speaker Tom Kmiec

I have to interrupt the member.

Before I recognize the member for Pierre‑Boucher—Les Patriotes—Verchères, I want to warn him that I will have to interrupt him in about eight minutes. He will have two minutes remaining when the House resumes debate on this bill.

The hon. member for Pierre-Boucher—Les Patriotes—Verchères.

Building Canada Strong ActGovernment Orders

October 5th, 2026 / 6:20 p.m.

Bloc

Xavier Barsalou-Duval Bloc Pierre-Boucher—Les Patriotes—Verchères, QC

Mr. Speaker, I want to start by making a brief comment on the speech given by the member who spoke before me, as I tried to listen to it. I sometimes like to practise my English, so I listen to speeches in the original language. I must say that I really sympathize with the interpreters, because I had a lot of trouble understanding everything that was said. However, I did understand a few things, because I tried to keep track of the number of times the word “pipeline” came up in the speech. I ended up losing count because it came up so often.

At least I understood that my colleague was talking about a pipeline. Since we are talking about Bill C‑39, I gather that she wants more pipelines. It is not a good time to be a Conservative right now, because the Liberals are building more pipelines than the Conservatives ever built, more than they ever would have dreamed of and more than they ever wanted. Unfortunately, this is not a good time for the planet either.

That is what I want to talk about in my speech on Bill C‑39.

The government decided to call this bill the “building Canada act”. That is what it says at the bottom of the screen for anyone watching this debate on Bill C-39 in the House. That kind of title always surprises me. Anyone who reads the bill will soon realize that it is not a law designed to build Canada. Rather, it is a law designed to give the government even more arbitrary powers to override existing laws, to gut environmental protections, to trample on workers' rights and to sell off our airports to the highest bidders. That sums up the bill. It is sad to see the government, which already had an authoritarian flavour when it was a minority, go even further now that it has a majority.

Earlier, one of my Conservative colleagues mentioned something that we have already reported a number of times in the House. I think it bears repeating, because the Liberals apparently fail to grasp the magnitude of what they are doing. We already passed Bill C-5, one of the worst bills I have ever had the misfortune of studying and debating in the House. Unfortunately, they are now proposing Bill C-39. Apparently, they had it in them to come up with something even worse. Bill C‑5 contained limitations imposed by the opposition because, in committee, we heard from a number of witnesses who essentially told us that Bill C‑5 was similar to the Emergencies Act. The government could claim there was an emergency, like the tariff emergency or the economic threat emergency, as an excuse to gain extraordinary powers that would let it override some laws and tailor others to suit specific projects that it decided were in the national interest.

At least we managed to impose some limits, such as the creation of a special committee to oversee the enforcement of Bill C-5. We also managed to include a sunset clause in the bill so that the measures would expire after five years, because an emergency is not a permanent state. It is temporary. What is more, those powers could not be used when the House was not in session, when Parliament was prorogued. That is basically all just common sense. In short, when the government is granted extraordinary powers, it must be held to account for how they were used.

Unfortunately, it seems that was not enough power for the government. The Liberals seem truly power-hungry right now. They have decided to get rid of the provision that ensured Bill C-5 would no longer be in effect after five years. That is mind-boggling. In five years' time, Donald Trump will not be U.S. President anymore. The emergency is now. If it is still an emergency in five years, then it is not really an emergency at all. It is a situation that has become permanent. An emergency cannot be permanent.

Clearly, the government wanted to use the emergency as an excuse to secure concessions and permanently weaken the rule of law. I have a real problem with that. Bill C-39 clearly reveals the Liberal government's true intentions. The Liberals must be held accountable.

Worse still, there are all sorts of other provisions in Bill C‑39 that weaken protections, particularly when it comes to workers' rights. I was the Bloc Québécois transportation critic, and I saw all kinds of lobbying for years. Every year, it was the same old tune. Representatives of ports, airports and all types of federally regulated businesses would come to my office and tell me that we really needed to find a way to prevent workers from striking. They would tell me that the government should declare that the national interest is too important for workers in pretty much every federally regulated sector to be able to exercise their rights. Of course, we know that the only leverage that workers have against their employers, aside from quitting, is to go on strike, to have everyone stand up and refuse to work in inappropriate conditions.

Unfortunately, workers who are unhappy with their conditions are now left with only one option: to quit and leave other workers in the same situation. The option of striking at least enables these people to demonstrate their solidarity collectively and build up their bargaining power. Individual workers have very little power. Sometimes they are not motivated to retrain in another field.

There is a certain hypocrisy here, in saying that the government is going to give people time, appoint an arbitrator, allow time for negotiations and then refer the matter to the Canada Industrial Relations Board.

As we all know, the reality is that the government does not want to bear the burden anymore. It does not want to have to justify its actions before Parliament anymore. Up until now, special legislation was required. The government wants to do away with that. It wants to decide everything by decree, behind closed doors, as was the case with Bill C-5. We can see how similar these two measures are in spirit. It is also clear why these two measures are both included in Bill C-39. In a way, these measures are both meant to undermine transparency. The government wants to make decisions behind closed doors, without consulting anyone and without being held accountable. This is very problematic for democracy.

It seems to me that the Liberals do not realize what they are doing. In its speeches and promises, the Liberal Party generally claims to stand for virtue, good faith and ideals. As I listen to my Liberal colleagues speak, I hear only naive optimism. They have nothing negative to say about what they are doing. However, when we actually read the bills, they are frightening.

I do not know if the Liberals realize what they are doing or if they are just blindly taking their leader at his word because they are completely mesmerized, have no idea what they are voting on on a daily basis and simply accept the message. I do not know if they are actually capable of thinking critically, if they read the bills and if they ask themselves questions. I wonder if, in caucus, they actually ask the ministers and the Prime Minister questions.

Personally, I am troubled b y the parliamentary dynamic that is taking shape. We saw debate cut short in the case of Bill C‑5. I hope we will not see that again with Bill C‑39.

It seems that the government is interested not in democracy, but in power. The Liberals are going to realize that at some point. I cannot believe that they will not listen to their constituents who will be experiencing difficult situations or when there will be protests in their ridings in the future against projects that will have been unilaterally imposed before an environmental assessment has even been completed. It is madness, but that is where we are headed. What a sad prospect.

I have a lot more to say, but my time is up.

The House resumed from October 5 consideration of the motion that Bill C-39, An Act respecting certain measures to strengthen the economy, be read the second time and referred to a committee, and of the motion that this question be now put.

Building Canada Strong ActGovernment Orders

October 6th, 2026 / 6:30 p.m.

Liberal

Patrick Weiler Liberal West Vancouver—Sunshine Coast—Sea to Sky Country, BC

Mr. Speaker, it is an honour to join the debate this evening on the building Canada strong act because Canada, at this moment, needs to build. In the interest of my limited time, I am only going to be talking about one of the three parts in this bill: build Canada now.

We need clean energy and transmission. We need critical minerals. We need expanded port, rail and trade corridors. We need the infrastructure that will connect Canadian products to new markets and make our economy more resilient. However, there is an important question we need to ask: Can we build faster without lowering the bar? I believe the answer is yes. I believe the key is to build a better, more coordinated system.

Today, projects can involve multiple federal processes, sometimes requiring similar information, with assessments, consultations and permitting decisions occurring at different stages. That creates uncertainty. It can delay investment, increase costs and make it harder for Canada to compete. Duplicative processes do not necessarily lead to better environmental outcomes.

Bill C-39 is designed to address that problem by coordinating federal assessment, permitting and consultation processes so they can happen together rather than one after another. We should be finding speed by doing the necessary work at the same time, not by making the same work happen twice. That, in my view, is the most important principle behind this legislation.

The same is true for how it approaches indigenous consultation. This bill would establish a more coordinated federal approach to consultation through a Crown consultation hub. Having worked with first nations, I know how some smaller first nations with more limited capacity can be overwhelmed by the number of referrals from government and the private sector.

Indigenous communities should be able to engage with the federal government through a coordinated process, rather than having to navigate multiple departments and overlapping requests about the same project. That is a meaningful opportunity to make the system work better. However, getting the coordination right would depend on getting the details of this overall bill right as well.

One of the issues I want to highlight is the meaning of a “comprehensive application”. That is important because the one-year timeline for project reviews and decisions under this act would begin once the proponent submits the comprehensive application and the required studies and information. That is important because the one-year period would be intended to cover the federal government's assessment, consultation, consideration of impacts and mitigation, and final decision-making.

If we are going to make that timeline meaningful, proponents and communities need clarity about what is required before this clock starts. If the threshold is too low, the clock begins before the science is ready. Regulators would not have all the information they need. They would be playing catch-up. First nations and the public may lose confidence in the system. If it is vague or impossibly high, years of delay may simply move to the period before the clock begins. The principle here is that predictability should come from clarity about what is required, not on cutting corners on what is required.

The second issue I would like to bring up is on public participation. This bill is intended to coordinate federal processes, but coordination also means that more information may be presented to communities at the same time. That can be challenging because large proponents can have teams of consultants, scientists, engineers and lawyers, while smaller communities, local organizations and first nations may not have that same capacity.

If we want a more efficient process, we also need to make sure that people have a fair opportunity to participate in it. That could mean making sure that we have adequate participant funding, access to technical expertise, clear and accessible information, properly staffed federal review teams, and meaningful opportunities for public and first nations input at the points where that input can inform decisions. A faster process should be a more coordinated process, not a process where the people affected would have less ability to participate.

The third issue I would like to bring up is on preparatory work. This bill would allow the environment minister to permit some preparatory work on a project before a decision on that project has been rendered, where it is found to be in the public interest. There is a very good practical reason to allow certain work to proceed while a broader assessment is under way. Surveys, geotechnical investigations, archaeological work and other preparatory activities can provide information that helps a project move through the review process. However, Parliament should be clear on what work can and cannot be done. It should not be irreversible, it should not prejudge the final decision or replace the assessment itself, and it should continue to respect indigenous consultation and environmental requirements.

Another important issue to consider is the authority to change project conditions where the minister determines that doing so is in the public interest. This is another new power that is proposed by this bill.

There are very legitimate reasons why conditions may need to evolve over the life of a project. Technology changes, project design changes, better mitigation becomes available or additional consultation identifies a better approach to a project. There is value in having that appropriate flexibility, but that flexibility should also come with transparency. I believe Parliament should look carefully at how that discretion is exercised so we understand the criteria that are going to be looked at and make sure that we have notice when changes are going to be proposed and have transparency about those reasons for those changes. If the government is going to be given this new power to change legally binding conditions, Canadians should have the transparency to understand why those changes are being made.

We should also look carefully at economic feasibility, because it is reasonable to ask whether a condition can actually be implemented. In fact, this is already common practice in project reviews, but there is an important distinction between asking how an environmental objective can best be achieved and deciding that the objective is too costly. The economic feasibility should help determine how an environmental obligation is achieved. It should not become a substitute for achieving the environmental outcome. That distinction matters, because building faster and protecting the environment are not competing objectives. They can and should reinforce each other.

One of the other areas I see significant opportunity in is regional assessments. Too often, project decisions are considered after a site has already been selected and significant investment has already been made. Regional assessments allow us to take a step back and ask some of the bigger questions, such as where development makes the most sense, where the most sensitive ecosystems are, what the cumulative impacts of multiple projects are, what infrastructure a region needs and what environmental limits need to be respected. This gives us a chance to think about development at the scale of the ecosystem, rather than looking at small projects in isolation. This helps us make better decisions about where and how development makes sense in the first place, which makes good environmental policy and good investment policy.

Finally, I want to address fish habitat compensation and third party habitat banking, because I see considerable potential in this approach. A mining company, a road builder or a port authority is not necessarily the organization that is best equipped to design and deliver habitat restoration. Specialized conservation organizations, indigenous organizations and restoration providers may be able to undertake larger and more ecologically coherent restoration projects. Having a system of third party habitat credits would allow that work to happen strategically in advance and get proponents better predictability when compensation is required.

We should also recognize an important ecological reality. Restoring habitat is not simply a matter of replacing one hectare with another. Ecosystems are complex, and there is uncertainty in how successfully restored habitat will function over time. This is why compensation should always remain at the end of the mitigation hierarchy. We should avoid impacts first, minimize them where they cannot be avoided, restore where possible and compensate for residual impacts that remain. Where that compensation is required, we should aim for outcomes that are genuinely nature-positive.

Overall, I support the direction of this legislation, because Canada needs to demonstrate that we can build, and we need a federal approval system that gives investors, communities and indigenous peoples greater confidence about how those decisions will be made. The speed should come from better coordination, better planning and better execution. It should come from federal processes happening together rather than one after another, from clear information requirements and from properly resourced consultation and participation. It should come from making decisions on time when the evidence is ready.

Given that the powers in this bill would be permanent, it is important that where new flexibility or discretion is created, Parliament instills clear and transparent processes. This means getting the definition of comprehensive application right, ensuring that public and indigenous participation remains meaningful, being clear about what preparatory work is, using ministerial discretion transparently, applying economic feasibility appropriately, using regional assessments to understand both development opportunities and ecological limits and ensuring that habitat compensation produces the strongest ecological outcomes possible.

Canada should not have to choose between building quickly and building responsibly. We can do both. We can have a project review system that is faster because it is better organized, we can give investors greater certainty without sacrificing rigorous assessment and we can build the infrastructure Canada needs while maintaining the environmental protections and public confidence the projects depend on.