This is from the published bill.

Part 1 implements certain measures in relation to project evaluations.
Division 1 of Part 1 amends the Impact Assessment Act to, among other things,
(a) provide that the Canadian Nuclear Safety Commission is to conduct the impact assessment of a designated project that includes activities that are regulated under the Nuclear Safety and Control Act ;
(b) authorize the Minister of the Environment to grant certain federal authorizations that are required in respect of a designated project at the same time that the Minister issues a decision statement in respect of the project;
(c) ensure that a decision statement in respect of a designated project for which the Impact Assessment Agency of Canada conducts the impact assessment is issued within one year after the proponent provides the required information or studies;
(d) provide for the coordination of the impact assessment of designated projects and the review processes for certain federal authorizations that are required in respect of those projects; and
(e) provide for the coordination of consultations with Indigenous groups.
Division 2 of Part 1 amends the Building Canada Act to, among other things,
(a) establish, for certain types of projects located within a region of national interest, a similar framework to the one applicable to national interest projects;
(b) allow the minister designated under that Act to add, remove or amend any condition in respect of an authorization that was granted for a national interest project before the name of that project was added to Schedule 1 to that Act;
(c) ensure that obligations to make information public associated with decisions made under that Act are administratively feasible; and
(d) authorize the Governor in Council to add the name of a region to a new schedule to that Act if the Governor in Council is of the opinion, having regard to certain factors, that the designation of that region is in the national interest.
Division 3 of Part 1 amends the Canadian Energy Regulator Act to, among other things,
(a) ensure decisions in respect of pipelines, designated power lines and offshore renewable energy projects are issued within one year of receiving the required information and studies;
(b) provide for the coordination of consultations with Indigenous peoples of Canada in respect of pipelines, designated power lines and offshore renewable energy projects;
(c) provide for the coordination of federal authorizations in respect of pipelines, designated power lines and offshore renewable energy projects with federal authorities;
(d) provide that the Commission is the sole assessor of applications in respect of pipelines, designated power lines and offshore renewable energy projects;
(e) provide authority for the Commission to
(i) make decisions in respect of applications relating to pipelines, designated power lines and offshore renewable energy projects, unless otherwise specified in the Act,
(ii) exempt certain pipelines or branches of or extensions to pipelines from the application of certain provisions, and
(iii) integrate a detailed route hearing into an ongoing hearing; and
(f) provide that the Governor in Council is to determine whether certain pipelines and designated power lines are in the public interest.
It also makes consequential amendments to the Federal Courts Act and the Northern Pipeline Act .
Division 4 of Part 1 amends the Canadian Navigable Waters Act to require the Minister of Transport to, among other things, take into account the feasibility of the terms and conditions in respect of an approval relating to certain works. It also transfers to that Minister the power to exempt bodies of water from the application of certain provisions of the Act if that Minister is satisfied that it would be in the public interest. Finally, it allows the Governor in Council to make regulations to exclude structures, devices or other things from the definition “work” to avoid duplication with other Acts and regulations.
Division 5 of Part 1 amends the Canadian Environmental Protection Act, 1999 to, among other things,
(a) ensure that environmental protection compliance orders may be issued with respect to any thing to which that Act applies and to non-continuing offences, including with respect to contravening imports;
(b) broaden the scope of such orders by permitting an enforcement officer to direct a person to take additional measures, such as managing contravening imports in the manner specified in the order, returning them to their place of origin or removing them from Canada; and
(c) provide that certain permits issued under that Act may, in certain circumstances, be valid for more than one year.
Division 6 of Part 1 amends the Species at Risk Act to, among other things, require the competent minister to take into account the feasibility of the terms and conditions in respect of certain agreements and permits.
Division 7 of Part 1 amends the Fisheries Act to, among other things,
(a) modify the fish habitat bank regime to allow for the use of habitat credits by third parties;
(b) authorize the making of regulations respecting the circumstances in which a person who is authorized to carry on a work, undertaking or activity may pay a fee to offset adverse effects on fish and fish habitat and provide for these fees to be credited to the Environmental Damages Fund; and
(c) transfer certain regulation-making powers from the Governor in Council to the Minister of Fisheries and Oceans.
Part 2 implements certain measures in relation to supply chains.
Division 1 of Part 2 amends the Department of Transport Act to provide the Minister of Transport with the power to establish a transportation project office that coordinates review processes for federal authorizations and consultations with respect to transportation projects.
Division 2 of Part 2 amends the Canada Transportation Act to, among other things,
(a) provide that the Minister of Transport may designate geographic areas as trade corridors and establish the National Trade Corridors Council, whose mandate is to monitor the movement of goods in trade corridors, analyze disruptions that may affect trade corridors and make recommendations and provide advice to that Minister;
(b) provide that Minister with the authority to make regulations to give effect to international standards or ensure compliance with Canada’s international obligations;
(c) expand the purposes for which that Minister may request that federal departments and agencies provide information that has already been provided by regulated entities to those federal departments and agencies;
(d) clarify the application of the requirement to notify that Minister of proposed transactions involving transportation undertakings;
(e) reduce the threshold for the requirement to notify that Minister and the Commissioner of Competition of proposed transactions involving transportation undertakings situated in a “port”, as defined in section 5 of the Canada Marine Act ;
(f) provide that that Minister may, for any purpose related to transportation security or safety, to the integrity of the national transportation system or to public safety or for any purpose specified by order, grant, suspend or cancel security clearances;
(g) authorize, for the purposes of administering and enforcing the security clearances regime, certain individuals or entities to collect information from and disclose information to each other;
(h) authorize the Governor in Council to make regulations respecting security clearances;
(i) expand the exceptions to the requirement to obtain the Canadian Transportation Agency’s approval for the construction of railway lines; and
(j) establish, for a period of four years, a zone in Manitoba, Saskatchewan and Alberta in which any interswitching that occurs is subject to the rate determined by the Canadian Transportation Agency.
Division 3 of Part 2 amends the Canada Marine Act to, among other things,
(a) authorize the Governor in Council to allow a port authority to enter into joint-liability arrangements and to create entities other than wholly-owned subsidiaries to undertake activities within or outside the limits of the port;
(b) authorize the Minister of Transport to appoint certain directors of a port authority;
(c) add principles that a port authority must observe when fixing port fees and expand the grounds on which a fee-related complaint may be filed with the Canadian Transportation Agency;
(d) authorize the Governor in Council to appoint, in certain circumstances, an administrator for a not-for-profit corporation that has entered into an agreement in respect of the St. Lawrence Seaway;
(e) authorize that Minister to terminate such an agreement or any part of one and provide for a dispute resolution process to deal with any disputes arising from the termination; and
(f) authorize that Minister to require that any of the following persons take measures to prevent or mitigate certain threats or stop any activity that would contribute to such threats:
(i) a port authority,
(ii) a person in charge of a port facility,
(iii) a person responsible for the management and operation of all or part of the St. Lawrence Seaway or for any works, undertakings or property used in the operation of the Seaway,
(iv) an occupier or person in charge of any federal real property, or any federal immovable, that is subject to being administered under Part 3 of that Act.
It also makes consequential amendments to the Port Authorities Operations Regulations .
Division 4 of Part 2 amends the Marine Liability Act to, among other things,
(a) modify the definition “receiver” to refer to the person who physically receives bulk hazardous and noxious substances carried by sea as cargo and discharged at a port or terminal in Canada; and
(b) harmonize the inspection and enforcement provisions relating to that person.
It also makes related amendments to the Safeguarding Canada’s Seas and Skies Act .
Division 5 of Part 2 amends the Coasting Trade Act to allow foreign ships or non-duty paid ships to engage, without a licence, in activities in response to a declared emergency.
Division 6 of Part 2 repeals the Shipping Conferences Exemption Act, 1987 and makes a consequential amendment to the Access to Information Act .
Division 7 of Part 2 amends the International Bridges and Tunnels Act to allow the Minister of Transport to make certain decisions that were previously made exclusively by the Governor in Council.
Division 8 of Part 2 enacts the Enabling Digital Trade Act which, among other things,
(a) sets out the rules for the use of electronic trade documents as the functional equivalents to paper trade documents that are related to trade in goods;
(b) eliminates the requirement to provide information to the Government of Canada in physical form in relation to the importation or exportation of goods; and
(c) permits a federal minister, or an officer or employee of a department or agency of the Government of Canada, to disclose information that is related to the importation or exportation of goods if the receiving minister, department or agency of the government is permitted by law to collect that information.
Part 3 implements certain measures related to the work force.
Division 1 of Part 3 amends the Canada Labour Code to, among other things,
(a) establish new requirements and timelines related to collective bargaining;
(b) provide for the transfer of certain rights in the context of certain contractors being replaced by new contractors;
(c) establish new requirements and authorities in relation to entering into first collective agreements;
(d) provide that the Canada Industrial Relations Board may certify a trade union as the bargaining agent for existing bargaining units in certain industries in certain geographic areas on application of two or more employers, on referral of the Minister of Labour or on that Board’s initiative;
(e) confer on the Minister of Labour the power to appoint a special mediator to assist parties in settling a dispute that arises in connection with the entering into, renewal or revision of a collective agreement; and
(f) establish new requirements for that Minister to direct the Canada Industrial Relations Board to take measures under section 107 of that Act.
It also makes consequential amendments to certain regulations.
Division 2 of Part 3 amends the Canada Labour Code to, among other things,
(a) authorize the Head of Compliance and Enforcement to issue a settlement enforcement order requiring an employer or director of a corporation to pay any outstanding amounts that are to be paid under a settlement with an employee; and
(b) permit an order to debtor to be issued, in certain circumstances, before a settlement enforcement order or payment order has been issued.
Division 3 of Part 3 provides that Division XIII of Part III of the Canada Labour Code does not apply to an employer and employees who are parties to a collective agreement that confers rights and benefits at least as favourable as those conferred by that Division XIII with respect to medical leave of absence with pay.
Division 4 of Part 3 amends the Wage Earner Protection Program Act to, among other things, define the term “former employer” for the purposes of that Act and to specify that the Minister may confirm, vary or rescind a determination of eligibility even without a request for review.

Elsewhere

All sorts of information on this bill is available at LEGISinfo, an excellent resource from Parliament. You can also read the full text of the bill.

Bill numbers are reused for different bills each new session. Perhaps you were looking for one of these other C-39s:

C-39 (2023) Law An Act to amend An Act to amend the Criminal Code (medical assistance in dying)
C-39 (2017) An Act to amend the Criminal Code (unconstitutional provisions) and to make consequential amendments to other Acts
C-39 (2014) Law Appropriation Act No.3 , 2014-15
C-39 (2012) Law Restoring Rail Service Act

Votes

Oct. 8, 2026 Passed 2nd reading of Bill C-39, An Act respecting certain measures to strengthen the economy

Debate Summary

line drawing of robot

This is a computer-generated summary of the speeches below. Usually it’s accurate, but every now and then it’ll contain inaccuracies or total fabrications.

Bill C-39 proposes coordinated federal reviews with targeted timelines for major projects, changes to transportation corridors, ports, trade digitization and security, and amendments to federal labour rules concerning bargaining, dispute resolution and worker protections.

Liberal

  • Supports faster project approvals: Supports a coordinated “one project, one review, one year” process to attract investment and build infrastructure faster, while maintaining environmental standards and Indigenous rights and consultation.
  • Modernizes trade corridors: Would designate national trade corridors, improve port governance and coordination, and digitize trade processes to reduce bottlenecks, strengthen supply chains and diversify exports beyond the United States.
  • Protects workers and bargaining: Supports earlier bargaining, mediation and stronger workplace protections to improve labour stability, while affirming workers’ right to strike and adding guardrails to exceptional government intervention.

Conservative

  • Supports building projects: Conservatives support faster construction, investment and jobs, but will judge Bill C-39 by measurable results rather than announcements, and say the previous Bill C-5 has delivered little.
  • Questions timeline guarantees: They argue the one-year approval promise is not binding: preparation occurs before the clock starts, and officials or cabinet can pause or extend it, leaving investors without certainty.
  • Wants deeper deregulation: Conservatives call for repealing Bills C-69 and C-48 and the industrial carbon tax, with one project, one review and firm approval deadlines instead of more bureaucratic workarounds.
  • Demands scrutiny of labour changes: Members warn that changes to section 107 could weaken collective bargaining and workers’ right to strike, and demand thorough committee study, consultation and safeguards before decisions are made.

NDP

  • Opposes bill C-39: The NDP argues the bill concentrates power in ministers, weakens workers’ rights, risks environmental safeguards and Indigenous rights, and transfers decision-making away from communities and independent experts.
  • Protects the right to strike: The party opposes codifying and expanding ministerial powers to end legal strikes, saying this undermines constitutionally protected rights, weakens workers’ bargaining leverage and discourages employers from negotiating fairly.
  • Safeguards environment and Indigenous rights: The NDP warns that fixed approval deadlines, weakened project conditions and accelerated consultation could harm ecosystems and compress Indigenous rights; it says meaningful consultation and environmental review are essential to responsible development.
  • Builds fairly and together: The party supports building housing, clean energy and infrastructure, but says nation-building must create good union jobs, respect Indigenous rights, protect the environment and include communities rather than prioritize speed and corporate rewards.

Bloc

  • Opposes Bill C-39: The Bloc will vote against Bill C-39, arguing that it uses the trade crisis to justify permanent changes that weaken environmental protections, workers’ rights and democratic accountability.
  • Environmental safeguards: The Bloc warns that rushed assessments, project pre-approval and shifting reviews to energy regulators undermine scientific independence, public consultation and the ability to prevent environmental harm.
  • Right to strike: The Bloc says the bill gives ministers broad discretion to end lawful strikes based on undefined national-interest criteria, weakening collective bargaining and shifting power toward employers.
  • Executive power and Quebec: The Bloc objects to concentrating authority in ministers and the Prime Minister, circumventing Parliament and laws, and intruding on Quebec and provincial roles in managing natural resources.

Green

  • Opposes rushed project approvals: The Green Party warns that Bill C-39 could direct billions in public money to projects without basic cost-benefit analysis, risking economic waste and serious environmental and Indigenous-rights harms.
  • Demands evidence and transparency: The party rejects the premise that speed is inherently beneficial, arguing that weak planning, political pressure and cabinet discretion without transparent evidence make major projects more likely to fail.
  • Protects environmental conditions: The Greens oppose amendments that make project approval conditions subject to tests of economic feasibility or practicality, warning proponents could challenge binding safeguards and weaken environmental laws.
  • Defends collective bargaining: The party supports the Canadian Labour Congress’s concerns about part 3’s threat to collective bargaining and the trade union movement, and calls for substantial amendments.
Was this summary helpful and accurate?

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 9:50 p.m.

Liberal

Evan Solomon Liberal Toronto Centre, ON

Madam Speaker, that was a great question, and I would welcome the hon. member's support as we build great transportation projects like high-speed rail. If he wants to help expedite those kinds of things, I would be more than delighted to welcome him and his support to move some of the major projects in transportation forward. We will count on his support. I look forward to the foreshadowing of his support for expediting great projects like high-speed rail.

Through this particular bill, Bill C-39, it is absolutely important that we are doing one project, one review, one year for major projects while keeping the regulations, the safety of the environment and the consultation with indigenous partners in place.

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 9:50 p.m.

Bloc

Mario Simard Bloc Jonquière, QC

Madam Speaker, I hope to have better luck with the minister than I did with his two colleagues, the member for Halifax and the member for Guelph. I asked them earlier how fast-tracking the Pacific link pipeline was going to help us sell more oil to other countries. His colleague from Guelph told me that there would potentially be customers in Europe and Asia, which is completely false.

I would like to remind the minister that 91% of our oil exports go to the United States. We are in the midst of a trade crisis. The government wants to use public money to build infrastructure that will benefit the Americans.

I would like to know, once and for all, and especially from him, whether he thinks it makes sense to make Canadian and Quebec taxpayers foot the bill for infrastructure that will mainly benefit Americans.

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 9:50 p.m.

Liberal

Evan Solomon Liberal Toronto Centre, ON

Madam Speaker, I thank my colleague for his question.

First of all, I want to point out that the projects of this government have supported Quebec, as we saw with Churchill, the largest clean-energy infrastructure project in North America, which benefited Quebec. This is absolutely critical.

To the member's question, and it is a good question, as the member knows, we sell oil now to the United States at a discount because it is the only customer. This project would allow us to expand our markets to have the revenue to support the very projects we want to build and to support all Canadians and, of course, the people of Quebec.

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 9:50 p.m.

Cape Spear Newfoundland & Labrador

Liberal

Tom Osborne LiberalParliamentary Secretary to the President of the Treasury Board

Madam Speaker, part of the problem we are facing in the country in these current geopolitical times is the fact that a proponent must go through a process where in one department, a silo, a number of boxes need to be checked, and in another department, another silo, a number of boxes need to be checked. Some of those are duplicates. I am asking the minister to comment on the importance of ensuring that we are competitive as a country so that we can attract business in this country, as opposed to it going to other countries, such as south of the border.

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 9:50 p.m.

Liberal

Evan Solomon Liberal Toronto Centre, ON

Madam Speaker, we know that delays have made Canada in some ways less competitive. The purpose of this bill is to have one project, one review, one year. This would give certainty to investors, get projects built and make Canada more competitive.

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 9:50 p.m.

Conservative

Scott Anderson Conservative Vernon—Lake Country—Monashee, BC

Madam Speaker, about a year and a half ago, the Liberal government told Canadians that Bill C-5 would fundamentally change the way major projects were approved and built in this country. Canada was going to build “at speeds not seen in generations”. We Conservatives allowed Bill C-5 to go through because we thought that the grandiose promises we were hearing would improve things even a bit. We were wrong, because the only thing of any importance that has been produced has been a cloud of MOUs and bucketloads of promises.

Eighteen months later, here we are again discussing another bill promising to do the same thing. What exactly has changed? There are a couple of projects that Bill C-5 was supposed to speed up. The Pacific link oil pipeline has not been built. The LNG Canada phase two expansion has not been done. The Coastal GasLink phase two construction has not even started.

Then I looked up projects around the world that had been finished in 18 months, and not just the building portion, but all the way from planning to completion. First of all, there was the Space Needle in 1962. There was also the Empire State Building in 1930, the Pentagon in 1941, the Alaska Highway in 1942, Tesla's gigafactory in Shanghai in 2019, and the Crystal Palace in London in 1851. Even the Eiffel Tower took less than two years from planning to completion. Why did these projects get built? It was because people actually wanted them to get built. They all shared a hard completion date, and on that date they were complete.

Unlike builders that want things to get built, the Liberal government seems to measure progress by announcements and handouts. By that measure, the Liberals clap themselves on their backs and announce that they stand behind Canadian workers, but Canadian workers and businesses measure progress by construction sites and paycheques. They want a society where people can succeed without depending on government handouts. They would prefer that the Liberal government not stand behind them if it means that the government will have its hand in their wallets.

At some point, loud media announcements have to become construction projects, and so far we have seen very few. Investors can manage even Liberal red tape when the rules are clear and predictable, but it is an impossible minefield with this degree of uncertainty. A company considering a multi-billion-dollar investment needs to know what information will be required, who will make the decision, how the federal and provincial processes will interact, and when the process will actually end. If Canada cannot provide that certainty, investors have other choices. We are competing for capital with jurisdictions around the world, and having enormous resources is not enough if companies will not invest because it will take too long or cost too much to develop projects.

Let us look at the Trans Mountain expansion. It was first proposed in 2012, received federal approval in 2016, had that approval quashed by the Federal Court of Appeal and was finally purchased by the federal government in 2018. The expansion itself did not get rolling until two years ago, in 2024. Until the Liberal government gets serious, projects will spend years navigating regulatory processes and government decisions before Canadians actually see shovels in the ground, if they ever do.

Let us take a look at one false promise. Bill C-39 promises a one-year period once an investor has submitted the required information and studies. This is sheer nonsense. I have been around government bureaucracies long enough to know that the step Liberals are promising in Bill C-39 should take no more than a week because the bottleneck is not there. The bottleneck comes long before that.

Do members remember the phrase “once an investor has submitted the required information and studies”? Those steps, the expensive studies, the arbitrary interpretations by bureaucratic middle managers in government, the lost reports, the forgotten files and the endless red tape are where the bottleneck is, long before the final step comes. That collection of documents, reports and permissions can take years and millions of dollars for any large project, and in a climate of grudging and self-sabotaging “hurry up and wait”, it is not looking promising.

In this political climate of overpromising and underdelivering, if the project ever does start, it will be in spite of the government, because so far, the speeds not seen in generations, the speeds promised by the Liberal government, have turned out to be speeds so slow that they have not been seen since the last ice age. Here we are again, lighting the fuse to a promised Liberal rocket ship of economic activity a year after the last one sputtered out in an ashtray.

I want to be optimistic. I want to think that this time, in spite of all the very real drawbacks, in spite of history and in spite of common sense, Bill C-39 will magically succeed where Bill C-5 failed so dismally, but it is a faint hope.

I want to give an analogy. We have a drought back home in my riding. One proposed solution is to raise the local dam by two metres to retain the freshet in the spring so the supply lasts all summer. The regional district argued that since no water has spilled over the top of the existing dam for the last couple of years, raising it will not actually help. On the face of it, this is reasonable logic. If the water does not even come up to the top of the existing dam, what is the point of raising the dam even higher?

That common sense leads me to ask, if the Building Canada Act, which gave the Liberal cabinet almost unprecedented power, did not manage to build anything, why should Canadians think for a minute that giving the Prime Minister's Office even more power with the building Canada strong act would work any better? Is this really about getting Canada working, or is it more about gathering power in the Prime Minister's Office?

Here is the thing. During the 2008-09 financial crisis, the Harper government introduced measures intended to do much the same thing, with the stated objective of shortening approval times for major projects. That proposal was much less hyped than Bill C-39 and much more effective. Back then, when Canada faced another economic crisis, the very idea of speeding things up set Liberal hair on fire. To take just one example, my very esteemed colleague, the Minister of Defence, at that time the Liberal environment critic, described the Conservative government as a “far-right Reform, Republican, Conservative regime...undermining the very environmental assessment that Brian Mulroney brought into this country in 1992”.

Apparently the minister is now not bothered by that prospect and has no concerns whatsoever, nor is any single member of the Liberal caucus concerned about a concentration of economic power or decision-making power almost oligarchic in scope. Does the minister now believe that his own Liberal government is aligned with the far-right Republican government in another country, the very country that his party blames for the dismal economy in Canada?

We have gone from the Building Canada Act to the building Canada strong act. I sincerely hope the second one works better than the first, but if we are back here in another year, debating another bill with “build Canada” in the title, Canadians are going to be disgusted, as they should be. Ultimately the test should be results. Canadians do not need handouts and school lunch programs, and loud announcements cannot replace jobs and the self-respect that comes with providing for a family.

I will approach the legislation with an open mind but also with the skepticism that comes from having heard promises before about accelerating major projects. The government has said it wants Canada to build at speeds not seen in generations. That is an ambitious standard, but ultimately Canadians should not judge this legislation by the number of announcements it kicks off. They should judge by what they can actually see being built, and so far it is not looking good.

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 10 p.m.

Conservative

Dan Albas Conservative Okanagan Lake West—South Kelowna, BC

Mr. Speaker, the room did not all jump up at once, but what a great speech that was. The member has really brought some things to mind. I know that the Prime Minister tweeted the other day, “In September last year, we referred LNG Canada Phase 2 in Kitimat, B.C., to the Major Projects Office. Now, it’s moving forward”.

This points out what the member has said. This was a final investment decision by the proponent. The Major Projects Office the Prime Minister talks about did not approve or advance the project. It is a form of regulatory Kabuki theatre. In the bill, the Liberals like to talk about creating a transportation project office, saying that this thing would help get projects done. The funny thing is that it would have no authority. It would be completely discretionary and optional for the minister. He could choose not to go ahead with it. Worse than that, unlike part 1 of the bill, which actually says that we would have a timeline, for which, of course, there are exemptions, it does not have any timelines for transportation projects.

Does the member feel, as I do, that there is so much regulatory Kabuki theatre going on?

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 10 p.m.

Conservative

Scott Anderson Conservative Vernon—Lake Country—Monashee, BC

Mr. Speaker, I was taken by the last speaker's claim that this would get rid of duplication and would make for more coherence. I am wondering why, after 11 years, there is so much duplication and why our process is incoherent. How can that be? We talk about these things, and I guess it feels almost as if we were talking about it in the abstract. No member of the House is sitting around the kitchen table wondering if they can make their mortgage. No member of the House is worried about their next paycheque. These are things that matter to people outside the House.

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 10:05 p.m.

Bloc

Andréanne Larouche Bloc Shefford, QC

Mr. Speaker, my colleague spoke at length about the current government's lack of transparency and less democratic approach.

Thanks to work done by my colleague, the member for Pierre-Boucher—Les Patriotes—Verchères, we included a five-year sunset clause in Bill C-5 to review the act. Strangely, the Liberals reversed that clause in Bill C‑39. This move even drew criticism from the Canadian Civil Liberties Association.

What does my colleague think about the fact that Bill C‑39 removes this five-year sunset clause?

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 10:05 p.m.

Conservative

Scott Anderson Conservative Vernon—Lake Country—Monashee, BC

Mr. Speaker, as I was saying before, I think we treat this as an abstract problem. We use big words, and we talk about how we are going to cut regulation and do all these things. Very few of us live in the real world as we work in the House. We do not have to worry about a paycheque. We do not have to worry about a mortgage. We do not sit around the kitchen table worrying about the future as people outside the House do. What we talk about in the abstract are real bread-and-butter problems out there. I would like the bill to actually make a difference. I just do not have very high hopes for it.

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 10:05 p.m.

Green

Elizabeth May Green Saanich—Gulf Islands, BC

Mr. Speaker, I appreciate the member's bringing us back to spring 2012, when the Harper government brought in the omnibus budget bill, Bill C-38, which repealed the Canadian Environmental Assessment Act, fast-tracked a new act, set time limits on every single phase of environmental review and passed the whole thing over for the first time to the National Energy Board.

The Kinder Morgan project was a prime example of something that took longer because of the haste with which the omnibus bill was pushed through and the fact that the National Energy Board, a quasi-judicial body that was exempted from operating as quasi-judicial body, could not meet the timelines. As a result of all that, the project went off the rails, and the federal court found that it had not followed due process. Haste makes waste.

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 10:05 p.m.

Conservative

Scott Anderson Conservative Vernon—Lake Country—Monashee, BC

Mr. Speaker, I really did not get a question out of that. It was a statement. I have no answer to a non-question.

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 10:05 p.m.

Liberal

Angelo Iacono Liberal Alfred-Pellan, QC

Mr. Speaker, I am proud to rise today to express my support for Bill C‑39, the building Canada strong act.

As the member for Alfred-Pellan, I represent a community that is at the heart of a growing region. Laval is a vibrant city of workers, families and businesses that depend on efficient infrastructure to grow.

Bill C‑39 is based on a simple reality: The world is changing quickly, so Canada must also be able to act quickly. We need to attract investment, build the infrastructure we need, diversify our trade and strengthen our economy. However, we must do so responsibly, upholding rigorous environmental standards and the rights of indigenous peoples.

That is precisely the balance that Bill C‑39 proposes. This bill would establish clearer, simpler and more predictable processes for carrying out projects.

Our government is committed to issuing decisions on projects requiring a federal permit within one year. This stability is essential for businesses and investors. It allows them to plan ahead, raise capital and create jobs.

However, moving faster does not mean compromising on quality. Bill C‑39 does not ask us to choose between the economy and the environment. We can build faster while maintaining high environmental standards. The bill provides for better coordination of processes and aims to reduce unnecessary overlap, particularly between federal and provincial assessments.

This approach is particularly relevant for Laval and my riding, Alfred-Pellan. Laval is at the heart of the greater Montreal area, and its economy depends on efficient transportation networks, both for citizens and for businesses. With over 13,500 businesses and nearly 165,400 people employed there, Laval is a community where infrastructure plays a central role in our economic development.

In addition, with Bill C‑39, our government wants to improve the coordination of federal approvals and create a transportation project office that can move priority projects forward. For a city like Laval, that means infrastructure that is more predictable and that allows our businesses to access major transportation networks and markets more efficiently.

This is not just about the economy. It is also about jobs. Workers are at the heart of this legislation. Bill C-39 seeks to modernize the Canada Labour Code, encourage early bargaining and strengthen dispute resolution mechanisms. The bill also provides for the hiring of 100 new health and safety officers, which would significantly increase inspection capacity.

In other words, we are not just building infrastructure. We are also building an economy that must provide good jobs and protect workers. Bill C-39 provides for several safeguards. It upholds Canada's strict environmental standards and indigenous rights. It also protects the right to strike, while encouraging the parties to resolve disputes more quickly through mediation and bargaining.

We want Canada to invest in its future, while doing things right.

We want a Canada where businesses can invest with confidence, where workers are protected and where communities benefit from better transit systems. Most importantly, we want a Canada that can move from planning to action. For Laval, Quebec and all of Canada, this legislation represents an important step toward building a stronger and more resilient economy. It is time to build.

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 10:10 p.m.

Winnipeg North Manitoba

Liberal

Kevin Lamoureux LiberalParliamentary Secretary to the Leader of the Government in the House of Commons

Mr. Speaker, I am wondering if my friend could provide his thoughts in regard to the overall approach that the government has taken since the last federal election.

When we think about Bill C-39, it is all about advancing what we have been talking about for the last year and a half since Canadians elected a new Prime Minister, and that was to build a stronger and a healthier economy here in Canada, an economy that works for all Canadians. In order to do that, we need a substantial piece of legislation like Bill C-39. It is to enable projects to actually go ahead. We can look at the 24-plus projects that have been handed over to the Major Projects Office. We can think of the half a trillion dollars of investment at a summit that was hosted by the Prime Minister just last month.

Can the member provide his thoughts on the bigger picture—

Building Canada Strong ActGovernment Orders

October 7th, 2026 / 10:15 p.m.

The Assistant Deputy Speaker John Nater

The hon. member for Alfred‑Pellan.