Actually, we established a shared collections centre in Montreal a few years ago now. It is now full and we are starting a second phase, another collection centre. As for the management model, this is a building belonging to the ETS. It has been renovated with cutting-edge technology. For example, when the climate changes, an exterior membrane maintains the temperature constant. This really is high technology. All the museums in Montreal rent a space and share the costs, so that it is much less expensive than for each to build their own storage themselves.
There is going to be another project, probably a little outside Montreal with some similar museums. With contemporary art especially, the pieces are very big. So a second project is on the drawing board for the development of another collection centre. I feel that the model is a success. It has generated international interest and a significant number of visits.