The general timelines still apply. The requirement is to have a proposed instrument within 24 months and a finalized instrument in place in 18 months, and that's to bring it to what is determined to be the level of quantification--in other words, the lowest detectable level possible, measured with current technology.
On October 17th, 2006. See this statement in context.