Tailings ponds are an accumulation of some 30 years of operation. You need a huge volume to ramp up to that scale of processing capacity. Because we want to blend the end-of-pipe tailing stream and cool it down with tailing-pond sludge, I have to measure both streams and ramp up. So I'm going to try to reach coverage of their end-of-pipe streams and then match that with tailing inventory.