Reclamation is very much driven by the available land on which you can put your reclamation soils and vegetation. The largest areas on the mine sites that become available for those will be the tops of tailings ponds.
As the tailings dikes get constructed, generally they're reclaimed as we go forward. But those are relatively small areas compared with the size of the tops of the ponds. So, certainly, speeding up the time in which those ponds are infilled with a trafficable surface on which you can put reclamation materials will speed up reclamation.
The ERCB has recently come out with a new directive putting some new guidelines around how fast tailings ponds have to be reclaimed. So I think the speed is going to increase in the future.