I was going to say that if we run out the clock today, and it looks like that's what the intention of this meeting is, at least for drafting instructions we could start with the outline that we started with. I think that gives us a very good basis to start doing the work on the report.
If the other members don't want to add anything to that, because of not wanting to look at drafting instructions, I think at least it's fair to the analyst to work with the initial outline that we gave them.