In terms of the time frame, what I can provide by way of context is that currently over 60% are in that range of requests being met within the existing 30-day time limit. We're obviously wanting to improve performance against the time limits that exist today.
I think that something the committee may wish to consider is this. What would be the implication of changing the time limit in terms of those performance standards, and what would be required as an investment if one were to set a more ambitious timeline?