Thank you, Mr. Chairman and committee members.
Let me begin by saying how very pleased I am to be here today to speak to you on the issues that face all harbour authorities on Prince Edward Island.
It has been my pleasure over the past six years to be involved with small craft harbours in my capacity as harbour manager for the Port of North Lake harbour authority, and I would like to address some of my concerns and some of the concerns of other members of our fishing community concerning small craft harbours in Prince Edward Island.
As members of the standing committee, I am sure you have been made aware of some of the shortcomings that Atlantic Canadian fishermen face when it comes to repairing and protecting our harbour structures from the rigours of Mother Nature and from the normal wear and tear of time.
Small craft harbours in Prince Edward Island is made up of 44 harbour authorities, only five of which have harbour managers. The bulk of the work at the remaining ports is left to a very dedicated group of volunteer boards comprised of fishers and harbour users.
My hat goes off to these volunteers, as I know the time I dedicate to trying to secure funding, to environmental assessments, to doing project proposals, and to the day-to-day running of my harbour. These volunteers deserve our utmost respect and support. They do all this while they are fishing their own fleets to provide for themselves and their families.
While the day-to-day running of our harbours is our main concern, one of the toughest tasks we face is the lack of funding given to small craft harbours to allow us to provide a safe environment for our users and for the general public.
On P.E.I., most of our infrastructure is fast approaching the end of its life cycle, which in turn means we are all fighting for the same replacement dollars. Our relationship with small craft harbours is very much a landlord-tenant arrangement, and we must both do our part to meet our commitments under this arrangement.
From the fishers' perspective, maintenance is a very essential necessity if we are to keep our wharves in a usable condition and safe for the fishers to access in their day-to-day activities. Over the past number of years it has been apparent that the funding provided to small craft harbours' budget is being cut, while the need for repairs to existing structures is increasing.
That being said, we were ever so grateful for the motion placed on the floor of the House of Commons by the member for the Cardigan riding on June 6, 2006, to increase the budget by an additional $35 million, reinstating $20 million that was to lapse and increasing it by $15 million. We understood that part of that request was included in the next year's funding.
I understand that departmental officials estimated back in November 2006 that it would require an ongoing budget of $130 million per year to carry out the small craft harbour program, but in fact it is my understanding that the annual budget is much less.
You must understand that without the appropriate dollars, a job that would cost a few thousand dollars, not done when repairs are needed, can escalate to hundreds of thousands of dollars, and one such incident comes to my mind.
At the port of Mink River, it was determined that approximately $30,000 was required for a small maintenance project to repair a section of wharf. Due to the fact that it was not secured and the project was not done, an 80-foot section of that wharf collapsed into the harbour in the spring of 2007, leaving fishers with nowhere to tie their boats and no place to land their traps at the end of the season.
Now, six months later, the part that fell into the harbour is being retrieved by a contractor, and instead of fixing the problem, basically what they are doing is infilling with a bit of rock, up to the old, existing piles. I was to Mink River yesterday, and from what I saw yesterday and from what I have been told by various officials, it is not suitable, it will be totally unusable to the fishers in the spring, and, furthermore, if the other section of wharf that is there is left untended, it may meet the same fate and collapse into the harbour in the spring.
Small craft harbours officials tell us there is nothing they can do, as they have no budget for such a problem as this, which is outside their normal maintenance.
Tracadie harbour also comes to mind. Over 12 years this port, which is home to 19 lobster fleets and large mussel operations that require space for 25 to 30 vessels, has faced problems with insufficient berthage space.
Also at Tracadie, the boat slipway is only usable at high tide, so if you happen to be fishing and happen to break down and happen to have to go up the slipway, you had better pray it's high tide or you will sit until the tide turns.
Also at Tracadie, dredging is an annual problem, as it is with most of our harbours in Prince Edward Island.
In the spring of 2007, ice damaged a section of wharf at Tracadie, and to date only band-aid solutions for their problems have been offered.
The problems at Mink River and at Tracadie are not isolated. They occur on P.E.I. from tip to tip, and everywhere else in our Atlantic coastal communities. If we are to provide a safe environment for our users, more funding must be put in the hands of small craft harbours.
On Prince Edward Island, an increase in the minor maintenance budget, which now is approximately $700,000, would go a long way in helping to ensure that problems like the one at Mink River are taken care of, which in turn would result in dollars saved that could be used elsewhere.
Now, I am not saying that everything is negative, as we enjoy a very good working relationship with our colleagues at small craft harbours. They do the best they can with the limited funding they are provided. But let me emphasize that cutting funding only leads to more disasters, disasters that are predictable without proper maintenance. I can think of a few harbours—Graham Pond, Savage, Launching Harbour—where the problem was seen, the problem was rectified, and things are well.
I manage the harbour at North Lake, and North Lake is a very heavily used harbour. My harbour numbers—my vessel number count—is 92, and 93 in the spring. My transient population during tuna season brings the vessel count in my harbour at night up to 200.
I am a harbour that was made for 78 thirty-eight-foot vessels. On a night when I would have 200 vessels, they would not only be from Prince Edward Island, but from Îles-de-la-Madeleine, the Gaspé, New Brunswick, and Nova Scotia. We also have a fairly high aboriginal fleet that comes in because of our adjacency to the snow crab grounds.
We are also known as the tuna capital of the world. We've played host to a lot of world class fishers and provide a service to an overcrowded population for that period of time. And let me tell you, our port, like many other fishing ports in the Atlantic region, was not designed for the size of vessels that fishermen use today, whether it be for tuna, lobster, scallop, herring, or other species, because the method of fishing has changed dramatically since the early days when these ports were built and designed.
As well, there has to be ongoing dredging maintenance at some of our harbours to ensure that fishers can travel in and out safely without going aground on sandbars placed by strong tides or storms.
We are always at the mercy of Mother Nature, and sufficient funding for small craft harbours is essential for the fishers to carry out a safe fishery on Prince Edward Island.
In conclusion, the harbour authority program has proven it can and does work. While we as harbour authority members do our utmost to ensure that our harbours remain vital pieces of our coastal communities, we ask that you strongly consider putting more funding in place to allow each of us to maintain safe and functional harbours, for our use as well as that of the general public.
Thank you.