I think I mentioned in my statement, and I won't take the time to repeat, regarding the money that was assigned to Pangnirtung, Pangnirtung is the first of the harbours that the study had recommended. There has been quite a bit of work done to advance that project this year. We have let a contract with the Municipality of Pangnirtung to start the first phase of the work, which includes some inner harbour dredging, some floats, a breakwater, and I'm missing the fourth component. But there is work in that first construction contract that has been let.
We've determined that in order to construct the breakwater we have to bring some material from a quarry in the town across to the harbour location. So we've had a contribution agreement signed with the town to allow work to proceed with repairing the road and bridge that are needed to get to the site. The work on that started this past Monday. It's getting cold. It's starting to freeze up there, but the work is progressing so that we're in a good position next construction season to start. The equipment has been pre-positioned by sealift. These are all extra elements that have to be taken into account in such a project.
So work is under way. The bulk of it will be over the next two years, but I can actually say that things started as of Monday.