I believe the mandate letter says that they would be reopened. The time frame was not that specific.
What we're looking at is exactly as you said, that is, all those options and whether it's feasible. In the space that was available, all the equipment has been taken out, so we do need to acquire new equipment as well. The standard for such an operation centre as well is to have what we call a back-up site. Basically, it's some redundancy to make sure that if something happens in that part of the city, we still can continue to provide service. We need to look at that as well. There are a number of considerations that need to be lined up before we can actually move ahead.