You're quite right, Mr. Trottier. The project is basically to proceed with the renovation of Centre Block, which is in itself extremely complex. In fact, we are not going to proceed the same way as we did for West Block, where we were literally able to empty all the rooms and practically rebuild the whole thing from the inside out. We have to ensure that all the artwork, for example, is preserved.
The feasibility studies, planning and steps, point by point, for Centre Block should take several years. When the building is ready to be used again, we will follow the sequence and ensure Parliament's duties are repatriated and, then, we'll ensure that optimal use is made of the spaces we have renovated on Wellington Street, in particular.