I have to interrupt as time is passing.
Is there something that could be done midway in the process in order to determine that the objectives will not be reached, whether savings, restructuring or layoffs? Do you have a plan with guidelines that would show that another six months or a year would be needed to make the changes? You must have realized over time that you were perhaps not going in the direction you had wanted.