However, it was mainly in and around the following projects, which I will go over for you.
The first was the service entrance in the pumphouse substation, which was $14.6 million. Another component was for a main substation replacement. There was also the north landing wharf substation, and these substations are where the heavy electrical equipment and switching equipment is in place.
Another component is the planning work on the caisson life extension, but I want to emphasize that it's for planning. The caisson is the large floating hull, if you will. If you're familiar with the doors that open and close on the Rideau Locks, this one is a similar type of door but it actually floats. We fill it up with water and it locks in place. That allows us to drain the dry dock. It's preplanning work on that particular part of the structure.
The following money is actually on the preplanning for the south jetty reconstruction. We're just in the preplanning phases of that particular work.