I apologize.
The cost of the 75% wage subsidy is projected to be $73 billion. The original cost of the 10% was over $4 billion, but we have reduced that to $975 million because of the way the two measures work together, and since you can't have both, the cost of the 10% original wage subsidy has been reduced.
I hope that's clear.