Thank you.
You mentioned that during the RFP there were 63 technical requirements, and then for whoever passed those technical requirement the second element came into it, which was the lowest price.
If my notes are correct, there were seven responses to the RFP and of those there were three that qualified, that met those 63, and then Nuctech was the lowest price.
Are you in a position to be able to share the gap between the price that Nuctech provided and the price that the other two provided?