Thank you.
Much has been discussed about project management, and the design and the costs of that. Also, we have to acknowledge that the acquisition costs, which I believe are the construction costs, are to the tune of $6.1 billion.
There seems to be sufficient breakdown of the project management and the design, but when I go to page 13 when you're talking about modelling, you seem to have made an attempt to break down the costs of the construction, which I assume is also called acquisition. You're talking about initial studies, analysis, engineering support, initial spares, system tests, trials and evaluation.
Is there a breakdown of the $6.1 billion by those categories that we might be in a position to be able to look at?