I think that's the confusing part for everybody: how ArriveCAN was actually built and how ArriveCAN was contracted. ArriveCAN was built as part of a series of contracts. The work under these contracts was implemented through a document called a task authorization. The same contract that was used for ArriveCAN was used to pilot Botler. It was the same standing offer, the same supply arrangement, between Dalian and Coradix and government that was used.
On October 26th, 2023. See this statement in context.