I have no problem accepting it, as long as it doesn't get in the way of RHI, which is already an established meeting, and the CMHC head. I have no problem listing it as an approved study already, to be scheduled later after we get through the two studies and three identified reports, as well as the drafting instructions and wordsmithing, which, in this committee, has taken a bit of time.
I have no problem saying yes in principle. Scheduling it may have to wait until we get through at least one or two studies.