Thank you.
I believe it was more of an issue of us being promised one thing and something else materializing.
There ended up being a lot of pipe showing up on site that we were told came from Korea, but the paint on it was still wet. There is a lot of shifty business going on with that employer. It's quite frustrating. That project was funded by such a massive amount of taxpayer dollars, and we had the old switcheroo pulled on us, for lack of a better term.