The schedule planned for tabling the report with the committee, Mr. Lemay, so that you could study it before December 12, means that you must have the draft report by December 7 at the latest. The draft report will be given to the production team on Friday December 1, so that you can get it on the 7th, and thus have time to study it before the 12th. Because of the schedule, that is what we had planned to do, and that is how we have proceeded.