Thank you, Mr. Chairman.
Mr. Lord, the second point you make is that what the industry minister requires is greater predictability and longer-term planning for spectrum access and allocation.
Should there be set-asides? Should there be caps?
We're hearing about an auction or auctions for the 700 megahertz band and the 2500 megahertz band. Should those be separate or together?