That cost was estimated in various places as being in the range of $300 million to $400 million as a result of the shutdown of Camp Mirage. Is that a figure you can confirm?
Jack Harris NDP St. John's East, NL
That cost was estimated in various places as being in the range of $300 million to $400 million as a result of the shutdown of Camp Mirage. Is that a figure you can confirm?
See context to find out what was said next.