Well, as we've seen in recent operations, let's say in the Libyan operations, we had a frigate that was deployed and operated there immediately, under General Bouchard's command in Naples. More from a Canadian perspective, Canada's forces and the navy, as one of the services, always has the principle of operating under what they call the Canadian task group concept, which means you send out a command ship with two or three escorts, and you have your own supply ship with you.
That was the intent when we went to war in the gulf. We had that, and I remember everybody was flying a Canadian flag, and we were all self-sustained in our operation down there.
As we speak, we have recently reacquired the possibility of doing that with the recent supply ship that came out of Lauzon in Quebec City doing trials on the east coast. If the admiral was asked and if NATO was to say it would like to have a Canadian task group to go and do whatever the mission was, he could right now put together a Canadian task group.
Although we no longer have command destroyers or air defence for the group, some of those frigates have been upgraded to be able to assume the role of command ships, so they could actually go down there. One of them would be the command ship; that new supply ship could join them, and other frigates could join them as well. They could even have a submarine join them, as the ideal task group includes a submarine as well. It could go and join all under a Canadian flag, as opposed to going and joining, let's say, a NATO group that is multinational. It's possible.
In fact, this new AOR was not even part of the shipbuilding program. If we all recall, it was not part of the initial plan. This is something that came up after the fact. In fact, from a naval perspective, I say thank God, because I don't think we're going to see the JSS out of the shipyard on the west coast for quite a few years yet.
Here we are. We have that capability back in our hands now. The frigates have undergone a good revamping program. They'll be good for quite a few years, but they'll need replacing. They'll need those CSCs to come behind, and we know that as soon as Irving finishes with the AOPS in Halifax, this is what they're going to undertake. That's going to take time as well.
The ball is rolling out, and we've passed all the deadlines we had planned back in 2010, so that's already eight years ago. We have a few AOPS that are coming off the line soon out of Irving, but that's about all we have.