The letter says the power supplies were connected to the safety upgrades, and that is correct. They were not connected to the pumps. That was seen to be and was corresponded both to the CNSC staff and in return correspondence from CNSC staff, which we submitted to Parliament. It was always clearly documented that the EPS system was not connected to pumps 4 and 5, but the letter--
On February 5th, 2008. See this statement in context.