Prior to 2003 there were issues related to the shut-off rods, the control absorbers. There was a study done by the Canadian Nuclear Safety Commission. One was also done by Atomic Energy of Canada Limited. It took a look at quality assurance issues through the construction of the MAPLE facility. These were some construction issues that were being dealt with at that time.