We still have more work to do to be able to complete that assessment. We have two challenges that have to be met. One challenge is to get the proper inspection equipment to the location inside the vessel where the leak and corrosion exist. We're producing special tooling to be able to deliver inspection equipment to that location, and we need to complete that inspection. We will not be able to complete all of that inspection until we have the fuel out of the reactor, and that will be at least two more weeks. The other thing is that with some inspection data we have to determine the appropriate repair technique. Once we have those two tasks done then we can put together a plan for repair and return to service.
On June 4th, 2009. See this statement in context.