We didn't work our way back specifically through different types of damage. We identified the various types of damage for the consultant, and the consultant did an evaluation of a foreseeable incident and what the likely cost of the damage would be. The study indicated that it would be within the bounds of the limits we had set.
On November 30th, 2009. See this statement in context.