We will certainly do two things. We will make sure the dual barrier concept remains valid, and both barriers would have to be in place. Before there's any potential to take away the drilling mud, we'll make sure there's a cement plug in place. We'll also make sure that the blowout preventer is fully tested so we can verify it can function, and it will function, when it's necessary to do so. We will make sure that is done. Chevron has assured us they want to do that, and I'm sure the folks at Stena have the same objective we all have, to have a safe, well-drilled exploration well.
On May 25th, 2010. See this statement in context.