Our role in the Bruce Power plant refurbishment process was to replace and install new boilers. SNC-Lavalin’s remit was to prepare for the removal of the boilers. The crane in the second photograph on page 3 or 4 is one we used in the process.
We are also here to tell you that the safety of our employees was a priority throughout the process. We monitored employee exposure several times a day to ensure that there was no contamination.
We were also responsible for ensuring that all the generator’s openings were properly welded shut. We contracted Kinectrics, which does work on several nuclear plants throughout the World, to check for possible leaks from the covers installed on the boilers.