We know up to a point.
First, the product leaves Petro-Canada and travels to Parachem's petrochemical plant. We're talking about a hundred or so jobs. It also goes to CEPSA. So that's 150 jobs. Neither of those includes the subcontractors. Next, various plants take it back. There's a small facility on the former Shell site, with a hundred jobs or so.
Afterwards, the product travels in all the other directions, and I lose track of it.