Yes, every stick and every panel that went into that building was prefabricated at our plant in the Okanagan down to plus or minus 1.5 millimetres in accuracy. That's where your time.... It's incredibly accurate. The material is perfect when it arrives, and as long as everything is ready to be installed, it can be taken.... This is what happened at UBC. They took it right off the truck and installed it and the truck was gone. There were two trucks a day.
Steel and concrete don't have the same tolerances and they're nowhere near as accurate, so that's where we really win. We just have to get those benefits of saving that time across to the construction community.
I think if we saw the federal government use a little more wood in their buildings that would send a message.