The sunk costs include the purchase price of $4.5 billion plus the additional $34.2 billion in terms of the construction costs. Those are the things that are considered sunk, and those are captured when we look at the overall balance sheet. Those are reflected there.
On November 18th, 2024. See this statement in context.