It depends on the project as a whole. You can have a water electrolysis project to generate green hydrogen that requires a very large investment in wind turbines, for example, or in creating a road system to access all of that. It really depends on the type of investment.
Basically, what determines eligibility for the credit is the equipment directly related to the electrolyzer, in the case of green hydrogen, or the equipment—