Correct.
That's interesting, because I spoke with Todd Smith, the Minister of Energy, and he talked about how they're going to need more gas turbine electricity in the medium term because their nuclear is going to take a long time to build.
You have Darlington, you have Pickering and you have Bruce. The only one of those that is in expansion is Bruce. The others are replacing previous electricity generation, but not to the same degree of energy produced before. Let's call it level in terms of the nuclear power that's going to contribute to the grid in Ontario.
Tell me how we're going to produce more electricity in Canada.