Thank you.
I have two things I would like to address. I have both the Peace Arch border crossing and the Douglas border crossing in my riding. This relates to the beyond the border pilot project.
What I heard was that the project was under way and it came to closure. Now you're looking for other pilot projects. What were the outcomes of that, and why are you looking at other pilots when you have already done a pilot and you already have the information I'm assuming you would require?