June 2 is committed already. That is clear. We agreed with that.
Having May 12 for IMVE is agreeable. May 26 is clear, and hopefully we'll finish that day, but there's no actual guarantee on that. I'm satisfied with leaving IMVE for May 31 if it is available, but not if the racism study is not finished.
For Blair, Lucki and Bastarache, I think that will hopefully take one day. If we can get drafting instructions on that day, then we can have a report on Bastarache by the end of June.
June 7 is for Levesque.
On June 9, I would want to start the CSC study. I want to start the CSC study early. The border study may be flexible to go on the 16th, and we can use June 9 for the Levesque study to hopefully get somewhere with that and do the CSC study on either June 9 or 14. Then there are three days left. We may need time to do Bastarache. We'll still have a second day for the CSC study and then we'll have the one flexible day.
That's the way I would see it shaking down. If we finish Levesque, that would be wonderful. If not, the fall could be a time when we would finish off the CSC, finish off the IMVE report if we don't get time to do it, and then finish Levesque. I think we could have two IMVE meetings in May and then one that could follow in June if there is a place outside of the dates that I've outlined.