On page 6, in the fourth or fifth paragraph, you make reference to the proposal to exempt minor waterways, etc., and say that overhead power lines will no longer be required to apply for approval if they meet specified criteria. Have those criteria been drawn up, or is that something that would come as a result of these changes?
On March 11th, 2008. See this statement in context.