I was going to say, considering that it's probably an $8 billion or $10 billion project, they must have awfully deep pockets.
On the P3 issue, I think we would rather stick with the issue of whether it's a good idea to investigate and to look at it. The funding issue is something that will be determined. It will be whatever is best. If you look at Bombardier, Lavalin, or PCL, there are lots of major construction companies that are up to it. There are various players, etc.
I guess with VIA Rail we wouldn't have to worry about that right now. In the future, we'd have to look at that. As we said, we're tentative about saying yes, go ahead. Which route do you want to take—the south shore or the existing CP right-of-way that's not used, going down through Peterborough up to Ottawa, that way? It's 80 kilometres shorter. It might be a better route. It might have greater advantages. They all have pluses or minuses. Until we see a concrete “here's this, and here's that”, we can't really put our mind to it. At this point, really, we're all blue-sky thinking here.