At this point, we're still at the preliminary stages. We've got a study under way looking at the engineering questions and also at whether this piece of infrastructure should reside with the Department of Public Works or whether it would be better handled as part of Port Metro Vancouver, perhaps, because it's really transportation infrastructure and not the kind of infrastructure that Public Works generally deals with.
We're also looking at whether this would be a good project for a P3 and getting private sector expertise in to work with the players to replace the existing bridge.