I think the dollars are driven off the rigour in the railway operating certificate, and the detail is absent at this point really for us to put a dollar figure on.
On February 17th, 2011. See this statement in context.
On February 17th, 2011. See this statement in context.
February 17th, 2011 / 4:20 p.m.
Vice-President, Operations, Greater Toronto Transit Authority; Urban Transit Authorities
I think the dollars are driven off the rigour in the railway operating certificate, and the detail is absent at this point really for us to put a dollar figure on.