That comes back to the timing issue of going through the P3 screening. If it's $100 million or more, it will be a very significant project. There will be a lot of work on engineering and all these things. As it's going through that process, it can also be going through the P3 screening.
Therefore, this concern about delaying a construction project probably is not true at all, because a P3 screening will probably move at a faster pace than the actual engineering work that will happen on a project of that kind of significance.