When we look at some of the cost declines we're seeing in both wind and solar, I don't think there's necessarily a requirement for dedicated programs for construction on the generation side. To the extent that is required in some provinces, I think it's best handled by the provinces.
What I was trying to emphasize was the need to lead Canada towards a more rational electricity system. Right now it's very balkanized, province by province. It's not optimized to make sure we're maximizing the integration of renewable energy or tapping into the opportunity to actually export a surplus of renewable power to the United States and help our neighbours to the south.