Okay. The second justification for the Gordie Howe bridge was for it to be a redundancy to the Ambassador Bridge. If there's a terrorist attack on the Ambassador Bridge, you have the Gordie Howe bridge. If the Gordie Howe is going to be a redundancy, then you need to have something for it to be redundant with. How could they say no to our permit if it's a redundant structure?
On September 24th, 2018. See this statement in context.